21.01.2015 Views

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> Rev 01<br />

Appendix 5 - Mooring Procedures LNG Jetty.<br />

The moorings will be 3.3.2 forward and aft.<br />

A sequential mooring running sequence based upon the following has been agreed.<br />

Mooring.<br />

• First lines ashore will be single Spring lines forward and aft.<br />

• Second lines ashore will be single Breast lines forward and aft.<br />

• The remaining moorings 3.3.2 will be run to sequence best suited to operational conditions<br />

agreed between Pilot/Loading Master and the ship’s Master.<br />

Unmooring.<br />

• The vessels will single up to a single Spring line and single Breast line forward and aft,<br />

letting go from forward and aft moving inwards towards the centre of the vessel.<br />

• On final letting go the vessel will let go both final Spring and Breast line together.<br />

0000-S-90-01-P-0207-00-E<br />

Page 83 of 101<br />

BM Code: EP.14.03.01.09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!