Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...
Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...
Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> Rev 01<br />
Appendix 5 - Mooring Procedures LNG Jetty.<br />
The moorings will be 3.3.2 forward and aft.<br />
A sequential mooring running sequence based upon the following has been agreed.<br />
Mooring.<br />
• First lines ashore will be single Spring lines forward and aft.<br />
• Second lines ashore will be single Breast lines forward and aft.<br />
• The remaining moorings 3.3.2 will be run to sequence best suited to operational conditions<br />
agreed between Pilot/Loading Master and the ship’s Master.<br />
Unmooring.<br />
• The vessels will single up to a single Spring line and single Breast line forward and aft,<br />
letting go from forward and aft moving inwards towards the centre of the vessel.<br />
• On final letting go the vessel will let go both final Spring and Breast line together.<br />
0000-S-90-01-P-0207-00-E<br />
Page 83 of 101<br />
BM Code: EP.14.03.01.09