21.01.2015 Views

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

Prigorodnoye Export Terminal Port Regulations.pdf - Inchcape ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Prigorodnoye</strong> <strong>Export</strong> <strong>Terminal</strong> <strong>Port</strong> <strong>Regulations</strong> Rev 01<br />

of decisions coming the their jurisdiction.<br />

VIII. The Order of the Reconstruction of Crossing Points.<br />

34. The proposal to reconstruct a crossing point shall be submitted to corresponding transport<br />

federal executive body (unless it is the initiator of reconstruction), which after agreement with the federal<br />

executive bodies carrying out different types of control, and with the executive body of a subject of the<br />

Russian Federation, shall take a decision on reconstruction.<br />

The decision shall determine the amount of reconstruction, the sources of its financing, the terms of<br />

its execution, the rules of functioning of the crossing point in the period of reconstruction.<br />

35. The assignment for the design, project-estimate documentation of the draft reconstruction of<br />

crossing points shall be worked out in the order, envisaged by Items 15 and 16 of the present <strong>Regulations</strong>.<br />

IX. The Financial and Material and Technical Maintenance<br />

of the Crossing Point<br />

36. The construction (reconstruction) of the crossing points, opened on the initiative of federal<br />

executive bodies, their outfit and technical equipment shall be carried out at the expense of the federal<br />

budget, the budgets of the subjects of the Russian Federation, allocated to the customers of these<br />

projects, as well as other funds, attracted according to the legislation of the Russian Federation.<br />

37. The construction (reconstruction) of crossing points, opened on the initiative of the executive<br />

bodies, their equipment, and also the creation of transport and engineering infrastructure shall be carried<br />

out at the expense of the budgets of the subjects of the Russian Federation, and also other funds,<br />

attracted according to the legislation of the Russian Federation.<br />

38. After the crossing point is brought into operation, the structural subdivisions of the state<br />

controlling bodies shall be provided in the established order with service and subsidiary premises, special<br />

places and technological equipment, necessary for the maintenance of proper control.<br />

39. Expenses on the equipment of a crossing point with special apparatus and technical means of<br />

control, their operation, as well as the salaries of the staff of the structural subdivisions of the state<br />

controlling bodies shall be made from the federal budget, envisaged for the corresponding federal<br />

executive bodies and also other funds attracted according to the legislation of the Russian Federation.<br />

40. The structural subdivisions of the state controlling bodies shall use the service and subsidiary<br />

premises, special places and technological equipment in conformity with their purpose according to the<br />

existing norms and rules.<br />

Appendix 3 - UK Standard Terms & Conditions for Towage & Other Services.<br />

1.<br />

(a) The agreement between the Tug owner and the Hirer is and shall at all times be subject to and include<br />

0000-S-90-01-P-0207-00-E<br />

Page 78 of 101<br />

BM Code: EP.14.03.01.09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!