Marda Project Case 2 Units 31-Dec-13 31-Dec-14 31-Dec-15 31-Dec-16 31-Dec-17 31-Dec-18 31-Dec-19 31-Dec-20 31-Dec-21<br />
Mining<br />
Ore T<strong>on</strong>nes Mined t - 163,307 501,732 580,539 540,904 454,567 501,732 501,732 118,190<br />
Waste T<strong>on</strong>nes Mined t - 941,569 3,398,268 3,319,461 3,359,096 3,445,433 3,398,268 3,398,268 548,531<br />
Total Movement t - 1,104,876 3,900,000 3,900,000 3,900,000 3,900,000 3,900,000 3,900,000 666,721<br />
Grade Mined g/t - 2.13 2.66 2.33 2.27 2.07 2.71 2.36 2.36<br />
Processing<br />
T<strong>on</strong>nes Processed t - 96,990 545,000 509,980 546,425 505,000 500,000 500,000 276,679<br />
Grade Processed g/t - 2.11 2.47 2.39 2.14 2.31 2.56 2.31 2.31<br />
C<strong>on</strong>tained oz oz - 6,567 43,210 39,246 37,571 37,505 41,176 37,134 20,548<br />
Recovery % - 94% 94% 94% 95% 95% 93% 92% 92%<br />
Recovered oz oz - 6,173 40,618 36,892 35,692 35,630 38,393 34,163 18,905<br />
Source: The Adjusted Marda Model<br />
600,000<br />
Marda Project (t<strong>on</strong>nes processed)<br />
500,000<br />
400,000<br />
300,000<br />
200,000<br />
100,000<br />
0<br />
2013 2014 2015 2016 2017 2018 2019 2020 2021<br />
Gold processed (t<strong>on</strong>nes)<br />
Source: The Adjusted Marda Model<br />
Key aspects <strong>of</strong> AMC's case 2 model are:<br />
• Assumpti<strong>on</strong>s as in case 1 for the first 4 years <strong>of</strong> producti<strong>on</strong>.<br />
• An additi<strong>on</strong>al 1 milli<strong>on</strong> t<strong>on</strong>nes <strong>of</strong> ore at a grade 2.31 g/t is added to the end <strong>of</strong> the mine life. AMC<br />
has assumed that operating costs are the same as those incurred in year 2014 for the extensi<strong>on</strong><br />
period. The head grade is based <strong>on</strong> the project average. The 1 Mt represents 50% <strong>of</strong> the Marda<br />
Inferred Resource c<strong>on</strong>verting to Ore Reserves. The average project head grade has been applied.<br />
• Processing recoveries are assumed to be 92% in the extensi<strong>on</strong> years to reflect a lower c<strong>on</strong>fidence<br />
in the recovery characteristics for this material.<br />
• Total gold producti<strong>on</strong> <strong>of</strong> 246 koz <strong>of</strong> gold.<br />
36