BDO CORPORATE FINANCE (WA) PTY LTD<br />

<strong>Polymetals</strong> Mining Limited and Southern Cross Goldfields Limited<br />

Technical Specialist's Report<br />

Table 4.2 Marda Gold Project – Ore Reserves at October 2012<br />

Pits Proved Probable Total<br />

Dry<br />

T<strong>on</strong>nes<br />

(k/t)<br />

Grade<br />

(g/t Au)<br />

C<strong>on</strong>tained<br />

Gold<br />

(koz Au)<br />

Dry<br />

T<strong>on</strong>nes<br />

(k/t)<br />

Grade<br />

(g/t Au)<br />

C<strong>on</strong>tained<br />

Gold<br />

(koz Au)<br />

Dry<br />

T<strong>on</strong>nes<br />

(k/t)<br />

Grade<br />

(g/t Au)<br />

C<strong>on</strong>tained<br />

Gold<br />

(koz Au)<br />

Battler 129.6 3.9 16.1 6.0 5.9 1.1 135.6 4.0 17.2<br />

King Brown 84.5 4.7 12.7 12.1 2.9 1.1 96.6 4.5 13.9<br />

Golden Orb 261.5 3.3 27.4 9.3 2.1 0.6 270.8 3.2 28.1<br />

Goldstream 86.3 2.5 6.9 – – – 86.3 2.5 6.9<br />

Pyth<strong>on</strong> 525.7 2.0 33.5 2.6 1.5 0.1 528.3 2.0 33.6<br />

Dugite 209.6 2.0 13.3 0.2 1.5 – 209.8 2.0 13.3<br />

Dolly Pot 355.6 1.8 20.8 0.3 1.2 – 355.9 1.8 20.8<br />

British Hill – – – 70.0 4.6 10.4 70 4.6 10.4<br />

Die Hardy 214.8 1.6 10.9 154.1 1.7 8.2 368.9 1.6 19.1<br />

Red Legs 70.1 3.4 7.6 85.1 2.8 7.6 155.2 3.1 15.2<br />

Total 1,937.7 2.4 149.2 339.7 2.7 29.1 2,277.4 2.4 178.5<br />

Source: Southern Cross Marda feasibility study<br />

4.1.8 Metallurgy and Processing<br />

4.1.8.1 Introducti<strong>on</strong><br />

It is proposed that mined ore from Marda will be treated in a nominal 0.5 Mtpa c<strong>on</strong>venti<strong>on</strong>al cyanidati<strong>on</strong><br />

treatment facility employing CIL for gold recovery.<br />

Ore to be fed to the proposed process facility will be sourced from ten discrete gold resources as described<br />

in the geological secti<strong>on</strong> <strong>of</strong> this review. Ore from different resource pits will be blended to suit the<br />

requirements <strong>of</strong> the processing plant. Metallurgical test work programmes <strong>on</strong> samples <strong>of</strong> ore from Marda<br />

have been undertaken over approximately ten years.<br />

During 2012 Southern Cross acquired the Sandst<strong>on</strong>e processing facility. Southern Cross c<strong>on</strong>tracted<br />

independent technical specialists to undertake an engineering study to prepare cost estimates for a process<br />

plant installati<strong>on</strong> involving utilisati<strong>on</strong> <strong>of</strong> the refurbished plant equipment to be relocated from Sandst<strong>on</strong>e to<br />

Marda.<br />

4.1.8.2 Metallurgical Test Work<br />

Historical metallurgical test work undertaken between the 1991 and 2011 programmes showed that tested<br />

samples from the Marda Central deposits were all relatively free milling ores <strong>with</strong> cyanidati<strong>on</strong> gold<br />

extracti<strong>on</strong>s varying between 84% and 97%. Comminuti<strong>on</strong> testing <strong>of</strong> oxide and primary samples indicated that<br />

the ore types tested could be classified as moderate to hard.<br />

A comprehensive programme <strong>of</strong> metallurgical test work was undertaken in 2012 <strong>on</strong> samples from the major<br />

ore deposits as part the recent feasibility study. The project assumpti<strong>on</strong>s are reas<strong>on</strong>ably based <strong>on</strong> the test<br />

work results.<br />

In the first year <strong>of</strong> plant operati<strong>on</strong> ore to be treated will be from the Dugite, King Brown, Goldstream and<br />

Pyth<strong>on</strong> pits followed by increasing amounts <strong>of</strong> Pyth<strong>on</strong> and Golden Orb ore, and then ore from the Redlegs<br />

deposit. In later years ore is mined from Redlegs, Die Hardy, British Hill and Battler deposits. AMC notes that<br />

<strong>on</strong>ly limited test work has been c<strong>on</strong>ducted <strong>on</strong> these deposits.<br />

Comminuti<strong>on</strong> Testing<br />

Results for key comminuti<strong>on</strong> parameters derived from both historical and recent comminuti<strong>on</strong> testing are<br />

presented in Table 4.3, together <strong>with</strong> the proporti<strong>on</strong> <strong>of</strong> LOM ore t<strong>on</strong>nes to be treated in the plant. Parameters<br />

tested were Unc<strong>on</strong>fined Compressive Strength (UCS), Crushing Work Index (CWi), B<strong>on</strong>d Rod Mill Work<br />

Index (RWi), B<strong>on</strong>d Ball Mill Work Index (BWi), Abrasi<strong>on</strong> Index (Ai) and SAG Mill Competency (SMC).<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!