BDO CORPORATE FINANCE (WA) PTY LTD<br />

<strong>Polymetals</strong> Mining Limited and Southern Cross Goldfields Limited<br />

Technical Specialist's Report<br />

3.1.4 Ore Reserves<br />

The pit optimisati<strong>on</strong> report formed the basis for the development <strong>of</strong> an Ore Reserve statement for the project.<br />

AMC has not reviewed the Ore Reserves however the Ore Reserves quoted are c<strong>on</strong>sistent <strong>with</strong> the study<br />

and the financial modelling.<br />

Table 3.2 shows the estimate Ore Reserves for Mt Boppy.<br />

Table 3.2<br />

Ore Reserves for Mt Boppy<br />

Reserve<br />

Category<br />

T<strong>on</strong>nes<br />

(kt)<br />

Gold<br />

Grade<br />

(g/t Au)<br />

C<strong>on</strong>tained<br />

Gold<br />

(oz Au)<br />

Proved 42 5.63 7,600<br />

Probable 507 4.19 68,300<br />

Total 549 4.30 75,900<br />

Key assumpti<strong>on</strong>s used for the Ore Reserve calculati<strong>on</strong>s include:<br />

• Mining diluti<strong>on</strong> 10%.<br />

• Mine recovery 95%.<br />

• Gold price $1,350/oz.<br />

3.1.5 Processing Operati<strong>on</strong>s<br />

<strong>Polymetals</strong> treated purchased tailings from the Elura Mine from 1993 to 2002, yielding 32 t <strong>of</strong> silver and<br />

5 koz <strong>of</strong> gold. From 2002 to 2005, <strong>Polymetals</strong> operated an open pit mine at Mt Boppy and produced 68 koz<br />

<strong>of</strong> gold from 500 kt <strong>of</strong> ore.<br />

The Mt Boppy plant has remained idle since 2005. The overall development c<strong>on</strong>cept requires processing for<br />

approximately 24 m<strong>on</strong>ths <strong>of</strong> 300 ktpa <strong>of</strong> ore grading 4.32 g/t Au. The shortness <strong>of</strong> the overall campaign<br />

presents ec<strong>on</strong>omic challenges such as the danger <strong>of</strong> over-capitalisati<strong>on</strong>, and the need to quickly attain<br />

forecast plant performance.<br />

3.1.5.1 Proposed Flowsheet<br />

<strong>Polymetals</strong> engineers developed the flowsheet shown in Figure 3.4 using experience gained from previous<br />

Mt Boppy operati<strong>on</strong>s, at White Dam and elsewhere plus the results <strong>of</strong> metallurgical test work carried out <strong>on</strong><br />

Mt Boppy samples in 2012.<br />