BDO CORPORATE FINANCE (WA) PTY LTD<br />

<strong>Polymetals</strong> Mining Limited and Southern Cross Goldfields Limited<br />

Technical Specialist's Report<br />

Table 3.4<br />

Basic Design Parameters<br />

Parameter Unit Value<br />

Crusher Annual T<strong>on</strong>nage t 356,400<br />

M<strong>on</strong>thly T<strong>on</strong>nage t 33,000<br />

Throughput t/h 156.7<br />

Operati<strong>on</strong> Days/week 5<br />

Operati<strong>on</strong> Hours/day 12<br />

Utilisati<strong>on</strong> % 90<br />

Primary Mill Annual T<strong>on</strong>nage t 300,000<br />

M<strong>on</strong>thly T<strong>on</strong>nage t 25,000<br />

Throughput t/h 38.1<br />

Operati<strong>on</strong> Days/wk 7<br />

Operati<strong>on</strong> Hours/day 21.6<br />

Utilisati<strong>on</strong> % 90<br />

B<strong>on</strong>d Ball Mill Wi kWh/t 18.1<br />

Gold Gold Recovery % 80<br />

Gold Producti<strong>on</strong> (total project) oz 62,511<br />

Operating costs are summarised in Table 3.5. Key cost c<strong>on</strong>tributors, such as labour, power and reagents are<br />

reas<strong>on</strong>able by industry standards.<br />

Table 3.5<br />

Processing Unit Cost<br />

Cost Element<br />

$/t<br />

Crusher lease 1.76<br />

Reagents/c<strong>on</strong>sumables 8.36<br />

Power 7.99<br />

Maintenance 3.89<br />

Labour 10.26<br />

Refining 0.88<br />

Processing Total 33.14<br />

The overall processing unit cost <strong>of</strong> $33.14/t is reas<strong>on</strong>able. A comparable gold plant in the area currently<br />

reports an overall processing cost <strong>of</strong> $35/t.<br />

3.1.5.6 Worker's Camps<br />

<strong>Polymetals</strong> currently operates a small, serviced camp in Canbelego for company geologists and mine<br />

caretakers. The project had allowed for the relocati<strong>on</strong> <strong>of</strong> a 60-pers<strong>on</strong>, camp from White Dam to Canbelego<br />

for Mt Boppy workers. Due to the imminent sale <strong>of</strong> the White Dam asset this camp is no l<strong>on</strong>ger available.<br />

AMC added a capital cost c<strong>on</strong>tingency to address the requirement to purchase a new camp. An appropriate<br />

site has been selected.<br />

A camp for the mining c<strong>on</strong>tractor will also be located in Canbelego.<br />

3.1.5.7 Water Supply<br />

Mt Boppy is in a regi<strong>on</strong> <strong>of</strong> very low rainfall (approximately 300 mm per year) therefore the mine must rely <strong>on</strong><br />

bore water for processing. The plant requires 450 ML/pa <strong>of</strong> make-up water, however <strong>on</strong>ly 240 ML/pa is<br />

available under the existing permit. Currently the intenti<strong>on</strong> is to bridge the shortfall by dewatering the pit.<br />

<strong>Polymetals</strong> state that the inventory currently in the pit together <strong>with</strong> future inflow will be adequate for the<br />

2-year life <strong>of</strong> the mine.<br />