BDO CORPORATE FINANCE (WA) PTY LTD<br />
<strong>Polymetals</strong> Mining Limited and Southern Cross Goldfields Limited<br />
Technical Specialist's Report<br />
Table 4.4<br />
Southern Cross Capital Estimate Summary<br />
Marda Infrastructure<br />
Cost Centre<br />
Capital Cost<br />
(Single SAG Mill)<br />
($M) 1<br />
Accommodati<strong>on</strong> camp, roads, airstrip, buildings/workshops 8.26<br />
Plant and Equipment<br />
Sandst<strong>on</strong>e equipment refurbishment and relocati<strong>on</strong> 4.59<br />
Additi<strong>on</strong>al equipment and installati<strong>on</strong> costs 13.17<br />
Provisi<strong>on</strong>al cost items 0.33<br />
Upgrade requirements 1.44<br />
Plant and Infrastructure C<strong>on</strong>tingencies (overruns) 5.26<br />
Tailings Dam 1.98<br />
Owners Costs<br />
Project Supervisi<strong>on</strong> 0.30<br />
First Fills 0.45<br />
Total Processing and Infrastructure 35.74<br />
1<br />
Costs exclude GST<br />
AMC notes that the allowance for the single SAG mill is based <strong>on</strong> sourcing a suitable used mill. There is a<br />
risk that actual costs in the milling area may increase depending <strong>on</strong> the cost and refurbishment <strong>of</strong> the mill<br />
that is sourced for the plant.<br />
AMC notes in ASX announcement <strong>of</strong> 14 August 2012 that Southern Cross quoted an estimated capital cost<br />
for the project at $25M (plus or minus $5M) to refurbish and relocate the plant from Sandst<strong>on</strong>e to Marda.<br />
AMC understands this was a preliminary estimate prior to the decisi<strong>on</strong> to upgrade the plant and the receipt <strong>of</strong><br />
a more detailed cost estimate. In AMC’s opini<strong>on</strong> the capital estimate shown in Table 4.4 is reas<strong>on</strong>able.<br />
4.1.8.7 Operating Cost Estimate<br />
Southern Cross has prepared an operating cost estimate based <strong>on</strong> an assessment by independent technical<br />
specialists in the July FS. This estimate was prepared to an accuracy level <strong>of</strong> ±20% <strong>on</strong> the basis <strong>of</strong> an<br />
annual ore throughput <strong>of</strong> 480 ktpa <strong>of</strong> blended ore.<br />
The Southern Cross cost estimate is presented in Table 4.5.<br />
Table 4.5<br />
Marda Operating Cost Estimate<br />
Cost Centre<br />
LOM<br />
($M)<br />
Operating Cost<br />
Mean LOM<br />
($/t ore treated)<br />
Salaries and labour 20.41 8.23<br />
Reagents and operating c<strong>on</strong>sumables 25.55 10.30<br />
Power 24.43 9.85<br />
Maintenance 3.09 1.24<br />
G/A, flights and accommodati<strong>on</strong> 1.46 0.59<br />
Total Process Operating Costs 74.93 30.21<br />
AMC c<strong>on</strong>siders the mean LOM unit operating cost <strong>of</strong> $30/t ore to be in general agreement <strong>with</strong> treatment<br />
costs for other Australian gold projects <strong>of</strong> a similar throughput and plant complexity.<br />
36