BDO CORPORATE FINANCE (WA) PTY LTD<br />

<strong>Polymetals</strong> Mining Limited and Southern Cross Goldfields Limited<br />

Technical Specialist's Report<br />

Table 4.4<br />

Southern Cross Capital Estimate Summary<br />

Marda Infrastructure<br />

Cost Centre<br />

Capital Cost<br />

(Single SAG Mill)<br />

($M) 1<br />

Accommodati<strong>on</strong> camp, roads, airstrip, buildings/workshops 8.26<br />

Plant and Equipment<br />

Sandst<strong>on</strong>e equipment refurbishment and relocati<strong>on</strong> 4.59<br />

Additi<strong>on</strong>al equipment and installati<strong>on</strong> costs 13.17<br />

Provisi<strong>on</strong>al cost items 0.33<br />

Upgrade requirements 1.44<br />

Plant and Infrastructure C<strong>on</strong>tingencies (overruns) 5.26<br />

Tailings Dam 1.98<br />

Owners Costs<br />

Project Supervisi<strong>on</strong> 0.30<br />

First Fills 0.45<br />

Total Processing and Infrastructure 35.74<br />

1<br />

Costs exclude GST<br />

AMC notes that the allowance for the single SAG mill is based <strong>on</strong> sourcing a suitable used mill. There is a<br />

risk that actual costs in the milling area may increase depending <strong>on</strong> the cost and refurbishment <strong>of</strong> the mill<br />

that is sourced for the plant.<br />

AMC notes in ASX announcement <strong>of</strong> 14 August 2012 that Southern Cross quoted an estimated capital cost<br />

for the project at $25M (plus or minus $5M) to refurbish and relocate the plant from Sandst<strong>on</strong>e to Marda.<br />

AMC understands this was a preliminary estimate prior to the decisi<strong>on</strong> to upgrade the plant and the receipt <strong>of</strong><br />

a more detailed cost estimate. In AMC’s opini<strong>on</strong> the capital estimate shown in Table 4.4 is reas<strong>on</strong>able.<br />

4.1.8.7 Operating Cost Estimate<br />

Southern Cross has prepared an operating cost estimate based <strong>on</strong> an assessment by independent technical<br />

specialists in the July FS. This estimate was prepared to an accuracy level <strong>of</strong> ±20% <strong>on</strong> the basis <strong>of</strong> an<br />

annual ore throughput <strong>of</strong> 480 ktpa <strong>of</strong> blended ore.<br />

The Southern Cross cost estimate is presented in Table 4.5.<br />

Table 4.5<br />

Marda Operating Cost Estimate<br />

Cost Centre<br />

LOM<br />

($M)<br />

Operating Cost<br />

Mean LOM<br />

($/t ore treated)<br />

Salaries and labour 20.41 8.23<br />

Reagents and operating c<strong>on</strong>sumables 25.55 10.30<br />

Power 24.43 9.85<br />

Maintenance 3.09 1.24<br />

G/A, flights and accommodati<strong>on</strong> 1.46 0.59<br />

Total Process Operating Costs 74.93 30.21<br />

AMC c<strong>on</strong>siders the mean LOM unit operating cost <strong>of</strong> $30/t ore to be in general agreement <strong>with</strong> treatment<br />

costs for other Australian gold projects <strong>of</strong> a similar throughput and plant complexity.<br />