BDO CORPORATE FINANCE (WA) PTY LTD<br />

<strong>Polymetals</strong> Mining Limited and Southern Cross Goldfields Limited<br />

Technical Specialist's Report<br />

Explorati<strong>on</strong> Valuati<strong>on</strong><br />

The explorati<strong>on</strong> licence (EL 5842) adjacent to the Mt Boppy mining leases was acquired in 2008 for $0.5M.<br />

Explorati<strong>on</strong> <strong>on</strong> the Tenement<br />

Recent drilling at most prospects generally failed to identify significant mineralisati<strong>on</strong> to encourage resource<br />

delineati<strong>on</strong> drilling. Results from other drilling are not yet available.<br />

AMC c<strong>on</strong>siders that a unit area value <strong>of</strong> $1,000/km 2 can be assigned to this tenement indicating a value <strong>of</strong><br />

$0.2M.<br />

3.1.9 Opportunities and Risks<br />

AMC c<strong>on</strong>siders that additi<strong>on</strong>al opportunities that might be available for Mt Boppy include:<br />

• AMC has not c<strong>on</strong>sidered underground mining <strong>of</strong> additi<strong>on</strong>al resources in its evaluati<strong>on</strong> as no work has<br />

been undertaken in this regard. However, Mineral Resources at Mt Boppy may have a grade that<br />

would support underground mining.<br />

• Overall plant recovery greater than the estimated 80% is achieved.<br />

AMC c<strong>on</strong>siders that the following risks apply to Mt Boppy:<br />

• There is a risk that due to geotechnical issues the pit walls may need to be designed at a flatter angle<br />

in the south-east corner <strong>of</strong> the pit, thus increasing the waste mining requirement.<br />

• The current estimate for mine dewatering volumes is a broad range <strong>with</strong> upper estimates likely to add<br />

to the operating cost <strong>of</strong> the project.<br />

• Throughput is not achieved in the upgraded treatment plant.<br />

• The grade and t<strong>on</strong>nage <strong>of</strong> the stope backfill material is lower than estimated in the Mineral Resource.<br />

• The existing underground voids cause instability in the open pit final walls.<br />

• Inferred Mineral Resource used to support the feasibility study may be lower in t<strong>on</strong>nes and grade than<br />

is currently modelled.<br />

3.2 Turner River<br />

The Turner River projects are located approximately 60 km south <strong>of</strong> Port Hedland in the Pilbara Regi<strong>on</strong> <strong>of</strong><br />

Western Australia (Figure 3.5).<br />

The gold project is located in the western tenements and includes the Wingina Well deposit. The base<br />

metals project is located in the eastern tenements and covers a 20 km l<strong>on</strong>g greenst<strong>on</strong>e belt hosting<br />

polymetallic mineralisati<strong>on</strong>.<br />

AMC pers<strong>on</strong>nel visited Turner River during 2012.<br />

The development and evaluati<strong>on</strong> work c<strong>on</strong>ducted by <strong>Polymetals</strong> <strong>on</strong> the Turner River gold project are<br />

preliminary in nature.<br />

18