Update on Merger with Polymetals - Notice of Meeting
Update on Merger with Polymetals - Notice of Meeting
Update on Merger with Polymetals - Notice of Meeting
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BDO CORPORATE FINANCE (WA) PTY LTD<br />
<strong>Polymetals</strong> Mining Limited and Southern Cross Goldfields Limited<br />
Technical Specialist's Report<br />
Figure 3.3<br />
Mt Boppy Geological Domains<br />
The resource estimate is a c<strong>on</strong>venti<strong>on</strong>al block model <strong>with</strong> grade estimated using ordinary kriging (OK) <strong>with</strong><br />
estimati<strong>on</strong> parameters determined from a study <strong>of</strong> variography. The stope fill was assigned a uniform<br />
average value <strong>of</strong> 3.6 g/t Au reflecting the mean grade <strong>of</strong> drillhole samples intersecting the fill.<br />
Bulk densities were assigned based <strong>on</strong> mean values for oxide, transiti<strong>on</strong> and fresh rock. The resource<br />
estimate is classified as Measured, Indicated and Inferred Resources based <strong>on</strong> c<strong>on</strong>fidence in the geological<br />
and grade c<strong>on</strong>tinuity reflecting drillhole spacing. The Mineral Resources are reported at a 2.5 g/t Au cut-<strong>of</strong>f<br />
grade (COG). The stope fill is classified as Indicated Resource.<br />
The Mt Boppy Mineral Resource has been estimated using accepted industry practice and has been<br />
classified and reported in accordance <strong>with</strong> the JORC Code 3 . AMC c<strong>on</strong>siders it appropriate to assign an<br />
average grade to the stope fill and while it is classified as Indicated Resource, there is greater uncertainty in<br />
local grade estimati<strong>on</strong> in the fill than in the in situ Mineral Resource.<br />
The Boppy South Mineral Resource estimate is based <strong>on</strong> drilling at about 20 m x 20 m spacing completed by<br />
<strong>Polymetals</strong> and previous tenement holders. The resource estimate is a c<strong>on</strong>venti<strong>on</strong>al block model <strong>with</strong> grade<br />
estimated using inverse distance squared. The estimate is classified as Indicated and Inferred Resources<br />
based <strong>on</strong> c<strong>on</strong>fidence in the geological and grade c<strong>on</strong>tinuity reflecting drillhole spacing. The Mineral<br />
Resource is reported at a 1.0 g/t Au COG.<br />
3.1.2.2 Explorati<strong>on</strong><br />
In additi<strong>on</strong> to resource definiti<strong>on</strong> drilling at Mt Boppy, explorati<strong>on</strong> has been carried out <strong>on</strong> other targets in the<br />
explorati<strong>on</strong> licence both by the previous tenement holder and <strong>Polymetals</strong>. <strong>Polymetals</strong> drilled 35 drillholes <strong>on</strong><br />
the other targets in 2012.<br />
3<br />
Australasian Code for Reporting <strong>of</strong> Explorati<strong>on</strong> Results, Mineral Resources and Ore Reserves, The JORC Code 2004 Editi<strong>on</strong>,<br />
Effective December 2004, Prepared by the Joint Ore Reserves Committee <strong>of</strong> the Australasian Institute <strong>of</strong> Mining and Metallurgy,<br />
Australian Institute <strong>of</strong> Geoscientists and Minerals Council <strong>of</strong> Australia (JORC)<br />
8