30.01.2015 Views

Orestimba Creek Feasibility Study - Stanislaus County

Orestimba Creek Feasibility Study - Stanislaus County

Orestimba Creek Feasibility Study - Stanislaus County

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Economics Appendix – Draft Report - <strong>Orestimba</strong> <strong>Creek</strong> <strong>Feasibility</strong> <strong>Study</strong>, <strong>Stanislaus</strong> <strong>County</strong>, California – September 2012<br />

Figure 1:<br />

For this analysis the Modesto MSA and State of California were both used as the geographical<br />

designation to assess the overall economic impacts of the construction funds. This places a frame around<br />

the economic impacts where the activity is internalized in this frame and leakages (payments made to<br />

imports or value-added sectors which do not in turn re-spend the dollars within the area) are not included<br />

in the total impacts.<br />

In this section, the evaluation of measurable monetary RED benefits (beyond the NED benefits<br />

described in prior sections) and the results of the RECONS models used in determining RED<br />

will be described.<br />

Table 1 below reflects the complexities of the Modesto California MSA in 2008. As shown by<br />

the Table, 64,844 persons are employed in the Statistical Metropolitan Area of Modesto<br />

California providing an output to the nation of $8,214,000,000 annually.<br />

79

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!