Orestimba Creek Feasibility Study - Stanislaus County
Orestimba Creek Feasibility Study - Stanislaus County
Orestimba Creek Feasibility Study - Stanislaus County
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Economics Appendix – Draft Report - <strong>Orestimba</strong> <strong>Creek</strong> <strong>Feasibility</strong> <strong>Study</strong>, <strong>Stanislaus</strong> <strong>County</strong>, California – September 2012<br />
At the time of this writing, much of the planned development in Newman has stopped due to the<br />
economic downturn. It is not known at this time when/if this development may pick up again.<br />
Most development is taking place on the southwest and northeast side of Newman and would not<br />
fall within the current 0.2% (1/500) ACE floodplain. If any inventory were to be developed<br />
within existing floodplains in the future, only damages relating to events less frequent than the<br />
1% (1/100) annual chance event would be counted, as it would be assumed that the structures<br />
were built with foundation heights above the water surface elevation for the 1% annual chance<br />
event. Any resulting damages would likely have minimal impact on the overall project damages.<br />
Therefore, the future condition is assumed to be the same as existing condition for purposes of<br />
this analysis.<br />
Floodplain maps showing the existing condition 10% annual chance and 0.2% annual chance<br />
events are show in the figures below.<br />
6