Economics Appendix – Draft Report - <strong>Orestimba</strong> <strong>Creek</strong> <strong>Feasibility</strong> <strong>Study</strong>, <strong>Stanislaus</strong> <strong>County</strong>, California – September 2012<br />

Table 7-2: Net Benefits and Benefit-to-Cost Ratio Ranges – Final Array of Alternatives<br />

October 2011 Prices ($1,000’s), 4% Interest Rate<br />

Alternative<br />

IDC Annualized Cost +<br />

Total First Cost (1,000) 1 ($1,000) 2 O&M ($1,000) 3<br />

Low<br />

(25%)<br />

Mid<br />

(50%)<br />

High<br />

(75%)<br />

Mid<br />

Low<br />

(25%)<br />

Mid<br />

(50%)<br />

High<br />

(75%)<br />

Annual Benefits<br />

($1,000) 4 Annual Net<br />

Benefits ($1,000) 5<br />

Low<br />

(75%)<br />

Mid<br />

(50%)<br />

High<br />

(25%)<br />

Benefit to Cost<br />

Ratio 5<br />

Low Mean High Low Mean High<br />

SB-1: No Action 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0<br />

NED 33,736 34,843 36,017 2,205 1,669 1,723 1,781 1,282 2,679 4,363 22 1,054 2,133 1.0 1.6 2.2<br />

LPP 41,285 42,927 44,260 2,719 2,042 2,123 2,189 1,282 2,679 4,363 -377 657 1,739 0.8 1.3 1.8<br />

1 Cost Range: Min= 25% Mid=50% Max= 75% (confidence costs are less than given value)<br />

2 IDC based on equal annual spending over a 2 year construction schedule.<br />

3 First Costs plus IDC amortized over 50 years at 4% plus annual O&M. Annual O&M costs: NED = $164k, LPP = $180k<br />

4 Benefit Range: Min=75% Mid=50% Max=25% (confidence benefits are greater than given value given all R&U)<br />

5 Values are a result of Monte Carlo simulations using triangular distributions of annual benefit and annual cost confidence intervals as inputs. Mean = Mean result from<br />

Simulation. The 5% tails on the low and high end of the simulation result are not included.<br />