Orestimba Creek Feasibility Study - Stanislaus County
Orestimba Creek Feasibility Study - Stanislaus County
Orestimba Creek Feasibility Study - Stanislaus County
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Economics Appendix – Draft Report - <strong>Orestimba</strong> <strong>Creek</strong> <strong>Feasibility</strong> <strong>Study</strong>, <strong>Stanislaus</strong> <strong>County</strong>, California – September 2012<br />
Table 3: Overall Summary Economic Impacts - NED<br />
Impacts<br />
Impact Areas<br />
Regional State National<br />
Total Spending $20,943,500 $20,943,500 $20,943,500<br />
Direct Impact<br />
Output $15,756,153 $25,246,486 $29,133,165<br />
Job 237.33 336.70 354.88<br />
Labor Income $10,518,365 $15,083,337 $16,254,315<br />
GRP $11,910,559 $17,953,342 $19,936,718<br />
Total Impact<br />
Output $26,882,557 $52,950,852 $81,237,156<br />
Job 326.03 529.83 684.54<br />
Labor Income $14,180,323 $24,283,164 $32,526,330<br />
GRP $18,423,909 $33,725,999 $47,159,765<br />
Table 4: Economic Impact at Regional Level -NED<br />
IMPLAN<br />
No.<br />
Industry Sector Sales Jobs Labor Income GRP<br />
Direct Effects<br />
26 Mining and quarrying sand,<br />
gravel, clay, and ceramic and $920,109 4.78 $374,339 $507,478<br />
refractory minerals<br />
319 Wholesale trade businesses $704,332 3.67 $268,068 $459,346<br />
333 Transport by rail $256,731 0.73 $63,696 $148,656<br />
334 Transport by water $94,844 0.15 $12,854 $34,756<br />
335 Transport by truck $631,756 5.48 $221,827 $294,153<br />
36 Construction of other new<br />
$190,377 1.25 $81,760 $86,131<br />
nonresidential structures<br />
365 Commercial and industrial<br />
machinery and equipment $4,391,023 13.64 $928,841 $1,813,059<br />
rental and leasing<br />
5001 Labor $8,566,980 207.64 $8,566,980 $8,566,980<br />
Total Direct Effects $15,756,153 237.33 $10,518,365 $11,910,559<br />
Secondary Effects $11,126,404 88.70 $3,661,958 $6,513,349<br />
Total Effects $26,882,557 326.03 $14,180,323 $18,423,909<br />
82