Golden Nematode Program Manual - Phytosanitary Resources
Golden Nematode Program Manual - Phytosanitary Resources
Golden Nematode Program Manual - Phytosanitary Resources
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Procedures: Control<br />
Non-chemical Control<br />
A. Articles to be treated should be placed as close together as<br />
possible.<br />
B. Arrange articles to allow space for placement of the steam<br />
distribution manifold.<br />
3. Place the steam distribution manifold pipe beneath the articles to<br />
be treated.<br />
A. The steam distribution manifold should be assembled and<br />
placed beneath the articles to be treated in order to facilitate<br />
steam distibution.<br />
B. A flexible steam introduction hose approximately 20 ft in<br />
lenth, connects the steam generator to a 10 ft long U-shape<br />
pipe capped at the ends, with 0.5 inch holes every 12 inches.<br />
The pipe serves as the steam distribution manifold.<br />
4. Place temperature recording sensors on the artile to be treated.<br />
5. When the treatment is being conducted in enclosures 4,000 ft 3 or<br />
less, use at least 4 recording sensors in addtion to the sensor on<br />
the steam generator. Place sensors in hard-to-treat cracks or<br />
crevices on the equipment or containers. Position sensors in the<br />
following locations:<br />
A. Front high—near the top of the front of the equipment or load<br />
B. Center middle—midway from the top and bottom of the center<br />
of the equipment or load<br />
C. Center bottom—bottom of the center of the equipment or<br />
load; but if the equipment is flush with the floor, then at least<br />
3 inches above the floor<br />
D. Rear bottom—bottom of the rear of the quipment or load on<br />
the left side; but if the equipment is flush with the floor, then<br />
at least 3 inches above the floor<br />
6. When the treatment is being conducted in enclosures greater<br />
than 4,000 ft 3 and less than or equal to 600 ft 3 , then use at least<br />
8 temperature recording sensors in addtion to the sensor on the<br />
steam generator. Place sensors in hard-to-treat cracks or<br />
crevices on the equipment or containers. Position sensors in the<br />
following locations:<br />
A. Front high—near the top of the left side of the front of the<br />
equipment or load<br />
B. Front low—bottom of the right side of the front of the<br />
equipment or load; but if the equipment is flush with the<br />
floor, then at least 3 inches above the floor<br />
C. Center high—near the top of the center of the equipment or<br />
load on the right side<br />
4-1-6 <strong>Golden</strong> <strong>Nematode</strong> <strong>Program</strong> <strong>Manual</strong> 07/2008-01<br />
PPQ