12.03.2015 Views

Golden Nematode Program Manual - Phytosanitary Resources

Golden Nematode Program Manual - Phytosanitary Resources

Golden Nematode Program Manual - Phytosanitary Resources

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Procedures: Control<br />

Non-chemical Control<br />

A. Articles to be treated should be placed as close together as<br />

possible.<br />

B. Arrange articles to allow space for placement of the steam<br />

distribution manifold.<br />

3. Place the steam distribution manifold pipe beneath the articles to<br />

be treated.<br />

A. The steam distribution manifold should be assembled and<br />

placed beneath the articles to be treated in order to facilitate<br />

steam distibution.<br />

B. A flexible steam introduction hose approximately 20 ft in<br />

lenth, connects the steam generator to a 10 ft long U-shape<br />

pipe capped at the ends, with 0.5 inch holes every 12 inches.<br />

The pipe serves as the steam distribution manifold.<br />

4. Place temperature recording sensors on the artile to be treated.<br />

5. When the treatment is being conducted in enclosures 4,000 ft 3 or<br />

less, use at least 4 recording sensors in addtion to the sensor on<br />

the steam generator. Place sensors in hard-to-treat cracks or<br />

crevices on the equipment or containers. Position sensors in the<br />

following locations:<br />

A. Front high—near the top of the front of the equipment or load<br />

B. Center middle—midway from the top and bottom of the center<br />

of the equipment or load<br />

C. Center bottom—bottom of the center of the equipment or<br />

load; but if the equipment is flush with the floor, then at least<br />

3 inches above the floor<br />

D. Rear bottom—bottom of the rear of the quipment or load on<br />

the left side; but if the equipment is flush with the floor, then<br />

at least 3 inches above the floor<br />

6. When the treatment is being conducted in enclosures greater<br />

than 4,000 ft 3 and less than or equal to 600 ft 3 , then use at least<br />

8 temperature recording sensors in addtion to the sensor on the<br />

steam generator. Place sensors in hard-to-treat cracks or<br />

crevices on the equipment or containers. Position sensors in the<br />

following locations:<br />

A. Front high—near the top of the left side of the front of the<br />

equipment or load<br />

B. Front low—bottom of the right side of the front of the<br />

equipment or load; but if the equipment is flush with the<br />

floor, then at least 3 inches above the floor<br />

C. Center high—near the top of the center of the equipment or<br />

load on the right side<br />

4-1-6 <strong>Golden</strong> <strong>Nematode</strong> <strong>Program</strong> <strong>Manual</strong> 07/2008-01<br />

PPQ

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!