12.03.2015 Views

Golden Nematode Program Manual - Phytosanitary Resources

Golden Nematode Program Manual - Phytosanitary Resources

Golden Nematode Program Manual - Phytosanitary Resources

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix A: Forms and Worksheets<br />

Sample Storage Worksheet<br />

Purpose<br />

The Sample Storage Worksheet is used to record and track each<br />

collection from the time the sample bags are brought into the Work<br />

Unit facility, placed onto the shelves, and moved from the rack room to<br />

the sample wash room for processing.<br />

Instructions<br />

The crew leader completes Sample Storage Worksheet on page A-1-13<br />

upon each’s collection’s arrival at the Work Unit rack room. After all<br />

samples in the collection listed on the sheet are dried and ready to be<br />

moved to the Wash Room, then the Laboratory Leader will transfer the<br />

information to the <strong>Golden</strong> <strong>Nematode</strong> Laboratory Sample<br />

Processing Daily Worksheet and draw a line through the collection<br />

on the Sample Storage Worksheet. Follow the instructions in<br />

Table A-1-9 to complete this worksheet.<br />

TABLE A-1-9 Instructions for Completing Sample Storage Worksheet<br />

Block Completed by Instructions<br />

DATE Crew leader LIST the date the collection is placed in the rack<br />

room<br />

COLLECTION Crew leader LIST the collection number (listed on the top row of<br />

the sample bag (field number)<br />

NO. OF SAMPLES Crew leader LIST the number of sample bags in the collection<br />

(located on the lower left of the bag; number<br />

indicated with END<br />

SOIL TYPE Crew leader ◆ If the type of soil in the sample collection is<br />

mineral, then LIST “Mineral”<br />

◆ If the type of soil in the sample collection is muck,<br />

then LIST “Muck”<br />

RACK Crew leader LIST the rack number where the collection is stacked<br />

in the Rack Room<br />

SHELF NOS. Crew leader LIST the shelf numbers where the collection is<br />

stacked in the Rack Room<br />

PROCESSED Crew leader As each collection is processed, PLACE an X in this<br />

block<br />

Distribution<br />

Distribute the Sample Storage Worksheet as follows:<br />

1. Keep the sheet on the Rack Room clipboard while the samples<br />

are drying.<br />

2. After the collections listed on the worksheet have been moved to<br />

the Wash Room for Processing, then place in the file.<br />

A-1-14 <strong>Golden</strong> <strong>Nematode</strong> <strong>Program</strong> <strong>Manual</strong> 07/2008-01<br />

PPQ

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!