EVALUATION OF CIP <strong>EQUAL</strong> TRANSNATIONAL CO-OPERATION PRINCIPLE<br />

Graph 46: Answer to the question: “In case that a project with transnational partnership implies a longer duration<br />

in comparison with projects that do not possess a transnational dimension, what are the phases of the<br />

transnational project requiring the allocation of more time?“ (more options could be selected at the same time;<br />

the data for all respondents from projects and from managing structures are mentioned)<br />

150<br />

140<br />

130<br />

120<br />

110<br />

100<br />

90<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

135<br />

21<br />

In case that a project with transnational partnership implies a longer duration in comparison with projects<br />

that do not possess a transnational dimension, what are the phases of the transnational project requiring<br />

the allocation of more time?<br />

92<br />

16<br />

preparatory work overall coordination implementation definition of rules and<br />

procedures<br />

68<br />

9<br />

Czech Republic [projects] Czech Republic [managing structures]<br />

Total [projects] Total [managing structures]<br />

63<br />

Navreme Boheme, s.r.o. 111<br />

20<br />

51<br />

11<br />

monitoring and<br />

evaluation<br />

43<br />

6<br />

10<br />

drawing of conclusions other<br />

2