EQUAL - Final report - eng - navreme
EQUAL - Final report - eng - navreme
EQUAL - Final report - eng - navreme
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
8.2 Evaluation Topics 1-6<br />
Navreme Boheme, s.r.o. 56<br />
EVALUATION OF CIP <strong>EQUAL</strong> TRANSNATIONAL CO-OPERATION PRINCIPLE<br />
Topic 1: Part of the study focusing on the support in the preparation the first call of Priority axis Transnational<br />
Co-operation OP LZZ<br />
TASKS DESCRIPTI<br />
ON 6 /<br />
EVALUATI<br />
ON<br />
CRITERIA<br />
Drafting a<br />
possible<br />
announce<br />
ment of<br />
the first<br />
call<br />
Priority<br />
axis<br />
Transnati<br />
Draft of the<br />
manner of<br />
ensuring<br />
and<br />
implementa<br />
tion of the<br />
first call<br />
Priority axis<br />
Transnation<br />
EVALUATION QUESTIONS RELATION<br />
SHIP WITH<br />
EVALUATI<br />
ON<br />
OBJECTIVE<br />
S 7<br />
How to determine the rules for eligible<br />
8, 15, 18,<br />
expenditures in the scope of this call?<br />
21, 1, 5<br />
How to define areas of support for this call in<br />
terms of the factual focus of the projects<br />
supported?<br />
How to define areas of support for this call in<br />
terms of supported forms of implemented<br />
transnational co-operation?<br />
EXPERTS<br />
8<br />
AP (4)<br />
AS (4)<br />
BB (8)<br />
EF (4)<br />
PJ (68)<br />
JK (17)<br />
EVALUATION<br />
METHODS<br />
USED<br />
ANAL, INT,<br />
VISIT<br />
TARGE<br />
T<br />
GROUP<br />
S 9<br />
DP, MA,<br />
NSS,<br />
EXP<br />
OUTPUTS REQUIRED 10 DEADLINE FOR<br />
OUTPUTS<br />
REQUIRED<br />
Practical recommendations<br />
on eligible expenditures, a<br />
suitable l<strong>eng</strong>th of the<br />
implementation of projects<br />
and the necessary<br />
mechanisms of support<br />
defined for the projects as<br />
well as MA.<br />
6 The tasks required and the evaluation questions are referred to here only. Activities leading to their fulfilment are described in detail in the timetable of works,<br />
including their timing and logical relationship.<br />
7 The evaluation has ten general and eleven specific objectives which have been referred to and numbered above. Although the fulfilment of the individual tasks is almost<br />
always related to all the general objectives (objectives 1, 6, 9 and 10 in particular), the numbers of these objectives are referred to, which are primarily fulfilled by<br />
the implementation of the task at issue.<br />
8 Given the fact that experts referred to in this offer work in a team, the list of persons would be irrelevant here since it would almost always have to comprise all the persons.<br />
However, the team operates in such a way that one or the maximum of two persons are in charge of a given task, the others contributing to the solution either by providing<br />
comments on the outputs and helping with the analysis, or by participating directly in some of the evaluation methods (for example the focus group is always led by at least<br />
two persons, the interviews and evaluation visits will be performed by 6 evaluators etc.). The number of work hours of the person at issue is referred to here to<br />
differentiate the extent of individual team members’ involvement. Work hours spent on methodical preparation, data analysis, team meetings,<br />
observations and producing the outputs has been added to the total number of hours cited in the budget.<br />
9 Key target groups are referred to in target groups, i.e. those providing the most significant materials for further analyses and findings in terms of quantity as well as quality.<br />
Given that the majority of evaluation tools operate across the target groups and that the questionnaire will be used as a flat-rate support for other evaluation techniques,<br />
materials for each individual evaluation step are conceived de facto on the results of the examination of more groups than just those referred to. However, only those groups<br />
primarily focused by the fulfilment of the task at issue are referred to for better comprehensibility. For the most part, the order of target groups is referred to based<br />
on its importance; this aspect is not always relevant and that is why we do not expand on this issue.<br />
10 All the outputs will be in English and Czech, the majority of intermediate products will also be processed in English and Czech in view of the transnational<br />
structure of the team of evaluators. The working language inside the team will be English.<br />
In three weeks<br />
after concluding<br />
the contract, the<br />
final version to be<br />
sent within 14 days<br />
after receipt of the<br />
observations