Carriageways Life Cycle <strong>Plan</strong>Table 14.7.1 Carriageway Reactive Maintenance Spend (£)2001/02 2002/03 2003/04 20004/05 2005/06Principal 0.63M 0.80M 38K 45K 71KClassified inc inc 315K 176K 202KUnclassified0.51K 0.28K 0.27KTable 14.7.2 Details the adhoc drainage maintenance spend over the last 5years.Table 14.7.2 Drainage Reactive Maintenance Spend (£)2001/02 2002/03 2003/04 20004/05 2005/06Principal 86K 86K 3.9K 2.3K 6.5KClassified 1.5K 4.5K 16.3KUnclassified7.3K 27.9K 57.2KThese sums are then allocated against work orders as and when requiredfollowing inspections or reports from members of the public highlightingcarriageway defects. The remaining budget available is updated as each neworder / invoice is placed and is checked on a fortnightly basis to limit anyoverspend.14.7.2 <strong>Plan</strong>ned Highway Maintenance schemes• Scheme Selection: Theidentification of plannedrevenue highway maintenanceschemes is undertaken atneighbourhood level using thecondition information gainedfrom the surveys. Thisinformation is then passed toMembers in the form of a plan.Assessment of this informationalong with recommendationsfrom the technical staff is usedto prioritise the need for work atvarious locations.• Scheme Selection: The identification of planned capital (LTP) highwaymaintenance schemes is undertaken using the condition informationgained from the surveys as assessed by the technical staff and theprogramme is approved by Members.107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!