11.07.2015 Views

Asset Management Plan - Newcastle City Council

Asset Management Plan - Newcastle City Council

Asset Management Plan - Newcastle City Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Highway Green Spaces Life Cycle <strong>Plan</strong>16.6.2 Renewal/ReplacementRenewal/replacement work is major planned (programmed) work that does notincrease the asset’s designed capacity, but restores, rehabilitates, replaces orrenews an existing asset to its original capacity. (Maintaining a ‘Steady State’)Table 16.6.2 details a number of ‘Steady State’ activities their relative merits andtheir expected programme intervals.Table 16.6.2 <strong>Plan</strong>ned Maintenance ActivitiesTreatment type Comments AnticipatedfrequencyTree replacementVerge reinstatement<strong>Plan</strong>ting trees to replace dead trees orthose that have been removed foranother reason, such as developmentworks.<strong>Plan</strong>ned reinstatement of a number ofdamaged verges within one worksprogramme.Programmes fortree replacementare instigated asand when required.Programmed whensufficient workshave beenidentified<strong>Plan</strong>ned maintenance is generally carried out following routine inspections, orreceipt of reports from Envirocall, Ward Stewards etc, followed by a moredetailed inspection process and an assessment of the nature of the work to beundertaken and how it can best be programmed.16.6.3 Creation/Acquisition/UpgradingCreation/Acquisition/Upgrading is major work that creates a new asset that didnot previously exist, or works that upgrade or improve an asset beyond itsexisting design capacity. Examples of Creation, Acquisition & Upgradingactivities are detailed in table 16.6.3.Table 16.6.3 Creation, Acquisition & UpgradingActivityCreationAcquisitionUpgradingExplanationIntroduction of grass verges to replace hard surfacing, plantingof new trees and hedges, installation of new flower & shrubbeds or planting areas.Adoption of new developments that may contain grass verges,trees, hedges or flower & shrub beds.Increasing the size of a verge area or the introduction of grassgrid in verges. Replacement of fences with hedges, andreplacement of hard areas with flower & shrub beds.At this time there are no known or programmed works for creation, acquisition orupgrading.16.6.4 Disposal144

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!