Street Lighting Life Cycle <strong>Plan</strong>BVPIs reported on an annual basis• BVPI 95 – Average Cost of a Working Street Light• BVPI 180 – Average Lamp Circuit Watts• BVPI 215a – Number of days taken to repair a non-emergency faultLPIs reported on a monthly basis• LP1 – Percentage of apparatus over 30 years old• LP2 – Percentage of units of apparatus conforming to the required lightingstandards• LP3 – Average time taken to repair a non-emergency fault working days• LP4 – Average time taken to attend an emergency• LP5 – Percentage of electrical tests undertaken against programme (Notcommenced until completion of installation programme)• LP6 – Percentage of re-lamp and clean undertaken against programme(Not commenced until year 3 of the contract)Table 19.11.1 Street Lighting Local Performance MeasureResults 2005 and 2006Start of July 2005 July 2006contractApparatus over 30 years old 58% 53.3% 43.5%Lighting units at current lighting 0 6.7% 28.9%standards (New equipment only)Average time taken to repair nonemergencyRequired less 4 Days 2.35 Daysfaultthan 5working daysAverage time taken to attendemergency faultRequiredwithin 1 HourLess than 1HourLess than 1Hour19.12 Improvement Actions Populate database withilluminated sign and bollardinformation Continue to update thedatabase as renewal worksprogress Import positional informationinto Symology and relate to GIS203

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!