11.07.2015 Views

Asset Management Plan - Newcastle City Council

Asset Management Plan - Newcastle City Council

Asset Management Plan - Newcastle City Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Signs, Barriers & Street Furniture Life Cycle <strong>Plan</strong>The following are the service option categories selected for inclusion in theHAMP♦ Statutory (Minimum): Meeting statutory or legislative requirements only♦ Existing: Is the effect of a continuance of current funding levels♦ Requested: The amount of additional funding required based on customerexpectations and political aspirations♦ Optimum Service: Assesses constraints as well as desires to identify aneconomically optimal Level of Service. This option is determined from thelife cycle planning process.♦ Attainable Service: Re-interprets the optimum option in the light ofavailable resources. (E.g. budget constraints).Table 20.7.1 below details the service options determined for the asset.Table 20.7.1 Signs, Barriers & Street Furniture Service Options<strong>Asset</strong> GroupStatutory MinimumExisting(2005/6 Budget)Requested AdditionalFundingOptimumGeneraldescription ofeach ServiceOptionMinimum (Reactive)level of service meetingstatutory or legislativerequirements only.The current LoStypically as set out inthe <strong>City</strong>’s MP ornational. COPsA LoS that attempts tomeet customerexpectations andpolitical aspirationsLoS based uponengineering principles& technical judgementSigns,Barriers &StreetFurnitureApprox. £130K paReplace potentiallyhazardous and damagedsigns & furniture only butthis would be offset by arise in reactivemaintenance in futureyears.Approx. £130K paAt present onlyreactive maintenanceis undertaken.Estimated at anadditional £1.57m pafor 5 years, plus anadditional £0.87m pathereafterThis will bring theassets up to anacceptable standardand remove thebacklog of works. Thisis based on a 20%sample of surveyedassets using bothinventory and conditioninformationEstimated at £1.7m pafor 5 years, thereafter£1.0m pa for lifecyclereplacementsMore flexible “needs”based maintenanceschedule. Signs &street furnitureinspected, cleaned andpainted on a regularbasis in order tomaintain the assetcondition in line withthe Code of Practice20.7.2 Levels of ServiceLevels of Service identified by <strong>Newcastle</strong> <strong>City</strong> <strong>Council</strong> specific to the Signs,Barriers and Street Furniture can be found in table 20.11.1 along with theiridentified performance measures.20.7.3 BacklogUsing the estimated condition ratings based on the condition survey, a currentbacklog figure has been calculated for each of the assets based on works beingrequired to any asset that falls within rating bands 4, 5 and M. (See table 20.3.1)Current backlog figures are shown in table 20.7.2 below.212

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!