Street Lighting Life Cycle <strong>Plan</strong>19.6 Lifecycle Option Appraisal19.6.1 Routine MaintenanceRoutine Maintenance is the regular ongoing day-today work that comprisesservicing rather than repair and is necessary to keep assets operating, this doesnot cover the repair or renewal of structural elements or components which havebecome unserviceable due to general wear and tear or have deteriorated forother reasons, but does include the day-to-day fault repairs undertaken on anadhoc basis. Routine maintenance activities for traffic signals are detailed intable 19.6.1.Table 19.6.1 Routine Maintenance ActivitiesMaintenance Activity Maintenance Interval CommentsBulk lamp changes 3 years At present this is onlyprogrammed for newequipment.Clean Back Lane3 yearsClean Non-PRN 4 years The contracted interval of 4years has currently beenreduced to 3 yearsClean PRN 4 years The contracted interval of 4years has currently beenreduced to 3 yearsInspect & Clean High Mast 2 Years The contracted interval of 2years has currently beenreduced to annuallyRepainting of apparatus 8 YearsFault repairAdhoc (see below)• Emergency faults shall be made safe or repaired within one hour ofnotification,• A non-emergency fault involving the replacement of components ofapparatus shall be rectified within five working days,• A non-emergency fault involving the removal of offensive or racist graffitior attachments shall be rectified within one working day,• A non-emergency fault involving the removal of all other graffiti orattachments shall be rectified within five working days,• A non-emergency fault requiring the replacement of a complete unit ofapparatus shall be rectified within fifteen working days,• A non-emergency fault involving rectification where an illuminated bollardhas been knocked down or a belisha beacon globe is missing shall berectified within one day,• Non-emergency faults involving the repair or replacement of any of theDistribution Network Operator’s System shall be rectified within 30 workingdays.197

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!