11.07.2015 Views

Asset Management Plan - Newcastle City Council

Asset Management Plan - Newcastle City Council

Asset Management Plan - Newcastle City Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Highway Green Spaces Life Cycle <strong>Plan</strong>♦Potential hazard to the public and operativesthis could in turn lead to a significant financial implication for:♦Compensation claimsConsequential costs could be:♦Poor public image of the <strong>Council</strong>This risk can be mitigated by regular inspections of all verges, and a targetedverge management regime including regular grass cutting.16.8.3 Another risk associated with highway green spaces is the possibilityof slips on slopes adjacent to the highway:This could be caused by♦♦♦Age of earthworksInadequate drainageSeverity of slopeWhich could result in:♦♦♦Potential hazard to the public & operativesDamage to the highway infrastructureDisruption to the travelling publicThis could in turn lead to a significant financial implication for:♦♦Compensation claimsRepairs to the highwayConsequential costs could be:♦♦Poor public image of the <strong>Council</strong>Hardship for the disadvantagedThis risk can be mitigated by regular inspections of all slopes, and theintroduction of a slope management regime.16.9 Forward Works ProgrammeIt is intended to develop a 10-year forward works programme for all routine and‘planned’ maintenance operations these will include:♦♦♦♦Regular inspections of the highway green spaces infrastructureGrass CuttingWeeding of flower beds and plantersHedge trimming149

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!