11.07.2015 Views

Asset Management Plan - Newcastle City Council

Asset Management Plan - Newcastle City Council

Asset Management Plan - Newcastle City Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bridges and Other Highway Structures Cycle <strong>Plan</strong>Table 17.2.2 Major Structure <strong>Asset</strong>s by Type and Route HierarchyRoadClassificationTotalStructuresAccomm -odationBridgeCulvert Footbridge RetainingWallRoadBridgePrincipal 57 3 36 13 5(motorway)Principal 102 4 7 42 26 23Non-Principal 3 1 2ClassifiedClassified 37 9 5 14 7 2Unclassified 89 2 17 28 21 12 9Total of EachType288 2 31 43 113 60 39Table 17.2.3 Other Structure <strong>Asset</strong>s by Type and Route HierarchyRoadClassificationSignGantryStairsHighMastLightingColumnPedes -trianWayOverbridgeBuildingTunnel Tunnel -ServicePrincipal 8 1 9(motorway)Principal 1 42 43Non-Principal0ClassifiedClassified 0Unclassified 5 4 1 1 11Total of EachType9 5 42 4 1 1 1 63SubwayTotalStructuresTable 17.2.4 details the length of River Tyne frontage structures none of whichhaving been included in the above.Table 17.2.4 River Tyne Frontage Structures by TypePrincipal Structure Type Total Length (m) Length owned / partowned by NCC (m)Revetment 8850 5310Quay Wall 7450 5680Suspended Quay 1500 1500Relieving Platform 590 590Slipway 190 190Other 80 20Total Length of Riverside 18660 13290Structures155

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!