11.07.2015 Views

Asset Management Plan - Newcastle City Council

Asset Management Plan - Newcastle City Council

Asset Management Plan - Newcastle City Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Footways & Cycleways Life Cycle <strong>Plan</strong>• Structural Maintenance;• Safety and Security;• Travel and Demand <strong>Management</strong>;• Economic Development;15.2 InventoryInformation on the inventory of footway infrastructure has been entered onto theSymology database. This is a recently acquired database, which at present onlyholds details of:• Street name (90%)• Footway classification (Prestige Area, primary / secondary walking routeetc.) (90%)• Location (90%)• BVPI’s (7%)• CVI data (50%)• CES condition assessment (95%)• Date of last inspection (95%)• Length (40%)• Width (20%)• Surfacing material (90%)• Kerb type / material (90%)• Channel type / material (30%)• <strong>Plan</strong>ned maintenance history (95% over the past year)• Reactive maintenance history (95% over the last 3 years)It is intended that the Symology database will eventually hold full details of:• Street name• Footway classification (Prestige Area, primary / secondary walking routeetc.)• Location• BVPI’s• CES condition assessment• Date of last inspection• Length• Width• Surfacing material• Kerb type / material• Channel type / material• Construction date• Construction materials / thickness• <strong>Plan</strong>ned maintenance history• Reactive maintenance history120

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!