11.07.2015 Views

download - Safegate

download - Safegate

download - Safegate

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

China - Shanghai Pudong International Airport, Terminal 2Equipment: T2-18Quantity: 42Duration: 2006 - 2007Scope:The airport terminal 2 to be built during the second-phaseproject, at a cost of 10 billion Yuan (1.2 billion US dollars) isexpected to go into operation in 2007. The new terminal atInternational Airport in Shanghai Pudong selected <strong>Safegate</strong> forthe delivery of docking guidance systems. The laser basedguidance systems will be installed at all gates and will beconnected to the airport central system AODB via the GateOperating System (GOS). The GOS will be linked to the FIS via thelocal LAN network. The selection of the aircraft is made from thelocal operator’s panel where the selection is compared andconfirmed by FIS before starting the docking procedure.The Central system will be delivered by the company Ultra.The Gate operating system will keep the scheduled flight for 48Hrs. if for any reason the FIS communication will be down.<strong>Safegate</strong> will also upgrade the Terminal 1 Gate Operating Systemto the same standard as Terminal 2. In the future there will becommon system for both terminals.Page 26 of 94

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!