11.07.2015 Views

download - Safegate

download - Safegate

download - Safegate

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Reduce the number of personnel on the apron.7. The system shall be capable of being interfaced with externalsystems such as UFIS, Ground Radar, IASS, AFL, etc.8. Ability to store long logs for every docking and easy access ofthese logs for analysis.9. Stand Monitoring and logging of docking images.Selection process: Project 1: Thermo LLC, an electro-mechanical contractor had toprocure these systems in the package TD-48. The contractorproposed FMT, the consultant Bechtel rejected the product as thesystem was not fully compliant to the specs. Our system wasproposed and the consultants and the client approved it.Project 2: The client signed the contract with us as we hadsupplied the VDGS and we met all their current and futurerequirements.Project 3: Transgulf LLC, an electro-mechanical contractor had toprocure these systems in the package AX11. FMT also proposedtheir system. The client and consultant were happy with thesystem performance at Concourse 1 and decided to place anorder to us.Project 4: Transgulf LLC, an electro-mechanical contractor had toprocure these systems in the package AX92. Since 69 systemswere reliably operating, the client chose our system.Project 5: B.K.Gulf LLC, an electro-mechanical contractor had toprocure these systems in the packages AX90 & AX94. Since 88systems were reliably operating, the client chose our system.Project 6: B.K.Gulf LLC, an electro-mechanical contractor had toprocure these systems in the package AX94. Since 92 systemswere reliably operating, the client chose our system.Project 7: Thermo LLC, an electro-mechanical contractor signedthe contract with us as we had supplied the systems atConcourse 1.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!