11.07.2015 Views

download - Safegate

download - Safegate

download - Safegate

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

e equipped with internal battery backup with an autonomy of10 minutes, such that docking process does not abort when mainpower is lost. The systems will be equipped with digital cameras(IP based) for apron monitoring and logging. Two-sidedilluminated gate sign and illuminated signs to display GPS coordinateswill also be supplied.Client objective: 1. Provide a reliable and safe VDGS.2. System fully compliant to ICAO Annex 14.3. Modernize the airport.4. Docking possible by both the pilots.5. Systems ability to check the profile of the incoming aircraft tothat of the selected one, to avoid collision of aircraft with theboarding bridge.6. Control and monitoring of all VDGS from Control Tower.Reduce the number of personnel on the apron.7. The system shall be capable of being interfaced with externalsystems such as UFIS, Ground Radar, IASS, AFL, etc.8. Ability to store long logs for every docking and easy access ofthese logs for analysis.9. Stand Monitoring and logging of docking images.Selection process: Project 8: Thermo LLC, an electro-mechanical contractor had toprocure these systems in the package AX324. As 109 systems arealready operational at the airport, they selected Safedocks.Project 9: B.K.Gulf LLC, an electro-mechanical contractor had toprocure these systems in the package AX94. Since 125 systemswere already supplied to Dubai Airport they decided to chooseSafedock.Project 10: B.K.Gulf LLC, an electro-mechanical contractor had toprocure these systems in the package AX94. The client wantedsystems similar to those supplied for Project 9.Equipment: VDGS T1Quantity: 164Duration: 2011-2012Scope:Project 1: Delivery of 164 T1 VDGS to replace VDGS T2 and T3and to expand up to a total of 168 gates with VDGS. The systemswill be equipped with the Apron Scan function to ensure anobject and obstacle free apron ready for docking an aircraft.Client objective: 1. Increased efficiency of the “pit stop” process by interfacing ofVDGS to the aircraft movement routing and guidance system.Selection process: Project 1: Al Naboodah, a contractor signed by Dubai Airport toassist in construction of new terminals and stands, designed toallow for the aggressive growth targets incorporated in strategicplan SP100, will in different phases install 164 new VDGS T1 from<strong>Safegate</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!