12.07.2015 Views

Performance Report – 2010 - Ministry of Finance and Planning

Performance Report – 2010 - Ministry of Finance and Planning

Performance Report – 2010 - Ministry of Finance and Planning

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

the development <strong>of</strong> electricity generation,transmission <strong>and</strong> distribution, reduction <strong>of</strong>system losses, <strong>and</strong> enhancement <strong>of</strong> renewableenergy usage <strong>and</strong> energy conservation.Electricity generation has increasedsubstantially by 8.9 percent compared with2009 against the background <strong>of</strong> higheconomic growth <strong>of</strong> 8 percent in <strong>2010</strong>.Thetotal installed capacity has increased from2684MW in 2009 to 2806MW in <strong>2010</strong>. TheGovernment has invested approximately Rs.9867 mn in electricity generation in <strong>2010</strong> .In addition, mainly due to the favorableweather conditions prevailed in the country,hydro power plants were operated at theirmaximum capacity. Therefore, the HydroPower generation increased significantlyfrom 34 percent <strong>of</strong> total generation in 2009 to47 percent in <strong>2010</strong>.By investing approximately Rs.6034 Mn, anumber <strong>of</strong> activities were carried out during<strong>2010</strong> to develop the transmission system inthe country compatible with new generationprojects. Around 14 projects wereimplemented isl<strong>and</strong> wide to enhance thetransmission system <strong>of</strong> which two projectsnamely Greater Colombo Grid SubstationPhase 11 <strong>and</strong> Kerawalapitiya - Kotugoda220kV Transmission Line Project have beencompleted during <strong>2010</strong>.As a result <strong>of</strong> government policy forenhancing the use <strong>of</strong> Clean Green Energy,during the <strong>2010</strong> the installed capacity sharefrom renewable energy was increased to 211MW <strong>and</strong> this is a 2 percent increasecompared with 2009.As a result <strong>of</strong> implementing energymanagement programmes such as regulatoryinterventions, establishment <strong>of</strong> energyconsumption benchmarks, conduction <strong>of</strong>energy audits, 312 GWh <strong>of</strong> energy has beensaved in <strong>2010</strong>During the year <strong>2010</strong>, the following projectswere recommended by the Power & Energysector <strong>of</strong> the Department for funding -1. Pre-feasibility Study -using NuclearPower <strong>and</strong> Conducting PublicAwareness2. Renewable Energy for RuralEconomic Development3. Proposed 3MW Wind farm with apilot Scale Hydrogen productionFacility in Narakkeliya, KalpitiyaPeninsula4. Reduction <strong>of</strong> Power Consumption onStreet Lighting in the Westernprovince5. Extension <strong>of</strong> Rural ElectrificationProject 046. Mannar Transmission DevelopmentProject (Term Loan FacilitySupported by Overseas United LoanInsurance <strong>of</strong> Nippon InvestmentInsurance7. Renewable Energy for RuralEconomic development (RERED)In addition, the Power & Energy sector in theDepartment has provided direct Observationsto 8 Cabinet Memor<strong>and</strong>a <strong>and</strong> supportiveobservations to 18 Cabinet Memor<strong>and</strong>aduring <strong>2010</strong>. Some <strong>of</strong> the direct observationswere important to take the followingimportant cabinet decisions. Pre-feasibility study to considerNuclear Power Programme in SriLanka Facilitates for the SamurdhiBeneficiaries <strong>and</strong> Low Income Peopleto get the Electricity serviceConnection under "Viduli Athwela"Project Introduction <strong>of</strong> Pumped StorageElectricity Generation Option in SriLanka.In line with a cabinet decision to introducelow cost power generation methods in thecountry to meet the increasing energy156

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!