12.07.2015 Views

Deliverable 4.4 - INSEAD CALT

Deliverable 4.4 - INSEAD CALT

Deliverable 4.4 - INSEAD CALT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AtGentive IST-4-027529-STP - Attentive Agents for Collaborative LearnersIt must be noted that this is a small quantity of data. A further problem is a lack ofhomogeneity within the data; often a small number of participants have used a functionfar more than others. However, the others tend to be disparate, making the removal ofdata as “outliers” highly problematic, since removal of one outlier usually invites the nextvalue in turn to be considered in similar terms. The decision was therefore taken to usethe data as obtained.Logged events comprise Date, Time, Event type, Event details. The main eventsavailable are:• User changes of screen• Creating / Editing / Reading postings• SearchesA typical log file would contain data of the form:17/09/2007 09:40:34 visiting place 'forum exchanges'17/09/2007 09:40:37 visiting place 'forum exchanges_exchanges'17/09/2007 09:40:48 reading message 'exchange on coaching'OBU created an analysis program that reads in all the log data and picks out selectedevents, outputting totals for further analysis.Number of logins per monthFirstly, the number of times participants logged in each month was calculated. This givesa broad view of how the system was used. Figure 19 shows logins for the months May toOctober, by treatment group (Control and Experimental) and as a total.As described in Section 2.2.8, the pilot began with an introduction to AtGentNet for TRIMparticipants at meeting in Lidköping, Sweden on 24th May 2007. However, many of theparticipants were sent details of the platform prior to this date, allowing them to log infrom mid-May onwards.On the 4th of September 2007 participants were sent emails inviting them to take part inthe Eagle Racing simulation (see Section 2.2.7). Therefore logins for September includeany specifically for this. (The racing simulation was over by 10th October, but adiscussion forum continued throughout October.)20181614121086420May Jun Jul Aug Sep OctCTLXPTOTALDel <strong>4.4</strong>: AtGentive Final Evaluation Report page 57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!