12.07.2015 Views

NanoLC 1D Plus and 2D System Operator's Manual - Eksigent

NanoLC 1D Plus and 2D System Operator's Manual - Eksigent

NanoLC 1D Plus and 2D System Operator's Manual - Eksigent

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8 Operator’s <strong>Manual</strong>step 5step 6step 7step 8Place the instrument on a lab bench.Check the contents of the accessory kit against the contents checklist in Appendix A to confirm thatall items are included.The checklist for parts included with the nanoLC Autosampler is included in the nanoLCAutosampler manual.Unpack the computer <strong>and</strong> monitor <strong>and</strong> verify that no parts are missing or damaged.2.3 Placement of the <strong>System</strong>Place the nanoLC system on a lab bench in a location with convenient access to power <strong>and</strong> a source of100 psi (6.9 bar) regulated clean, dry air or nitrogen. The front of the instrument should be accessibleat all times. The sides <strong>and</strong> back of the instrument should be clear to accommodate mobile phasereservoir placement <strong>and</strong> attachment, <strong>and</strong> computer cable attachments2.4 Connecting to the Air SupplyOperation of the instrument requires connection to a source of 100 psi (6.9 bar) regulated clean, dry airor nitrogen as described in the section on Site Requirements.Figure 2-1. Rear Panel - Air ConnectionRequired tools <strong>and</strong> materials:• Clean, dry source of air or nitrogen at 100 psi (6.9 bar)• In-line moisture trap with ¼” end-fittings• 6 mm or ¼” air supply line (included)• Quick-connect adaptor to 6 mm or ¼” supply line (included)step 1step 2step 3Connect the supplied air line to a source of 100 psi (6.9 bar) regulated clean, dry air or nitrogenusing the supplied quick-connect adaptor. Connect the other end of the air line to the air connectionon the back of the nanoLC system (see Figure 2-1).Turn on the air source to the nanoLC system.Test for air leaks. Turn off air supply <strong>and</strong> repair any air leaks that are found.nanoLC Operator’s <strong>Manual</strong> 611-00012 Revision A1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!