12.07.2015 Views

NanoLC 1D Plus and 2D System Operator's Manual - Eksigent

NanoLC 1D Plus and 2D System Operator's Manual - Eksigent

NanoLC 1D Plus and 2D System Operator's Manual - Eksigent

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

iiiTable of ContentsChapter 1. Safety <strong>and</strong> Site Requirements .....................................11.1 Safety Conventions ....................................................................................................11.2 nanoLC Safety Practices ..........................................................................................11.3 nanoLC Autosampler Safety Practices..................................................................21.4 Site Requirements ......................................................................................................41.4.1 nanoLC Power Requirements ....................................................................41.4.2 nanoLC Autosampler Power Requirements ...........................................41.4.3 Air Supply Requirements.............................................................................41.4.4 Bench Space Requirement.........................................................................51.4.5 Environment Requirements.........................................................................5Chapter 2. <strong>System</strong> Installation ........................................................72.1 nanoLC <strong>System</strong> Overview ........................................................................................72.2 Unpacking the nanoLC <strong>System</strong>...............................................................................72.3 Placement of the <strong>System</strong> ..........................................................................................82.4 Connecting to the Air Supply...................................................................................82.5 Connecting the PC.....................................................................................................92.6 Connecting the nanoLC to Power ..........................................................................92.7 Installing Software <strong>and</strong> Instrument Settings...................................................... 102.8 Configuring the nanoLC <strong>System</strong>.......................................................................... 112.9 Configuring the nanoLC Autosampler ................................................................ 13Chapter 3. <strong>System</strong> Initialization....................................................153.1 Hardware Components <strong>and</strong> Functions............................................................... 153.2 Loading Mobile Phases .......................................................................................... 153.3 Preparing the nanoLC Autosampler.................................................................... 193.4 Flushing the Autosampler Syringe <strong>and</strong> Liquid Path......................................... 203.5 Connecting the nanoLC to the nanoLC Autosampler..................................... 203.6 Verifying the Flow Rate........................................................................................... 21Chapter 4. Routine Maintenance ..................................................234.1 Recommended Maintenance ................................................................................ 234.2 Disposing of Waste................................................................................................. 244.3 Changing the Sample Loop................................................................................... 244.4 Replacing Capillary Connections......................................................................... 254.5 Zeroing the Pressure Transducers ...................................................................... 264.6 Checking Flow Stability.......................................................................................... 284.7 Autotuning Flow Controllers.................................................................................. 284.8 Calibrating the Flow Meters .................................................................................. 294.9 Cleaning <strong>and</strong> Inspecting the Instrument............................................................. 31nanoLC Operator’s <strong>Manual</strong> 611-00012 Revision A1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!