12.07.2015 Views

NanoLC 1D Plus and 2D System Operator's Manual - Eksigent

NanoLC 1D Plus and 2D System Operator's Manual - Eksigent

NanoLC 1D Plus and 2D System Operator's Manual - Eksigent

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>System</strong> Initialization 17step 6 Set the composition for mobile phase A: Enter the correct solvent composition for Mobile Phase A.the A mobile phase will generally be mostly water.step 7 Set the composition for mobile phase B: Enter the correct solvent composition for Mobile Phase B.the B mobile phase will generally be mostly acetonitrile.Figure 3-2. Mobile Phases Windowstep 8 Click the More… button to present the purge <strong>and</strong> flush settings (Figure 3-3).Figure 3-3. Mobile Phases Window — Advancedstep 9Purge the bubbles from each pump using the priming tool using the following steps:a. Under Purge Settings, select only one pump to purge, i.e. channel 1 A. Set the number ofpurge cycles to 20.b. Click Purge Now. The pump will begin to execute purge cycles. While the pump is purging,insert the priming tool all the way into the pump <strong>and</strong> depress the check valve.nanoLC Operator’s <strong>Manual</strong> 611-00012 Revision A1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!