12.07.2015 Views

Untitled - Flannery Plant Hire

Untitled - Flannery Plant Hire

Untitled - Flannery Plant Hire

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OBSERVE ENGINE OPERATION CLOSELYBREAK-INIMPORTANT: Be extra cautious during the first 50hours, until you become thoroughly familiarwith the sound and feel of yournew machine.1. Operate the machine only in economy (E) mode andlimit the engine horsepower up to about 80 % of fullload.2. Avoid excess engine idling.3. Check indicator lights and gauges frequently duringoperation.EVERY 8 HOURS OR DAILY1. Perform 8-hour or daily service. (See Maintenanceguide -- 8 hours.)2. Watch for fluid leaks.3. Lubricate working tool pivots every 8 hours for thefirst 50 hours, and every 8 hours when working inmud and water.AFTER THE FIRST 50 HOURS1. Perform 50-hour service. (See Maintenance guide --50 hours.)2. Check accessible hardware torque. (See HardwareTorque Specifications in Maintenance chapter.)AFTER THE FIRST 100 HOURSPerform 50-hour and 100-hour service. (See MaintenanceGuide -- 50 hours and 100 hours.)2-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!