12.07.2015 Views

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Crime</strong> & Criminals Tracking Network and Systems ProjectSikkim PoliceSlNoSpecificationHot Swap redundant power supplies to beprovidedPower supplies should have N+N. All PowerSupplies modules should be populated in thechassis13 Hot Swappable and redundant Cooling UnitManagementSystems Management and deployment tools toaid in Blade Server configuration and OSdeployment,Remote management capabilities throughinternet browserIt should provide Secure Sockets Layer (SSL)128 bit encryption and Secure Shell (SSH)14Version 2 and support VPN for secure accessover internet.Ability to measure power historically for serversor group of servers for optimum power usageBlade enclosure should have provision toconnect to display console / central console forlocal management like trouble shooting,configuration, system status / health display15 Built in KVM switch or Virtual KVM feature over IP.Dedicated management network port should have16separate path for managementSupport heterogeneous environment: AMD, Xeonand RISC/EPIC CPU blades must be in same17 chassis with scope to run Win2003/2008 Server,Red Hat Linux / 64 Bit UNIX, Suse Linux / 64 BitUNIX / Solaris x86Complied(Y/N)Referenceto DataSheetValue Add (Ifany)/RemarksSoftware for Data Center & DR CenterCAS (State) will be developed in two distinct technology stacks by the Software DevelopmentAgency at the Center. The details of the Technology Stacks are provided as Annexure II Detailsof technology stack-CAS (Center) and CAS (State) to this <strong>RFP</strong>. The <strong>SI</strong> is expected to bid withone of the technology stacks in response to this <strong>RFP</strong>. <strong>SI</strong> shall procure all necessary requiredsoftware for DC & DR including Operating System, Database, and Other Software Licenses. Allsoftware licenses should be in the name of Sikkim Police and should be a perpetual license, i.e.the software license should not expire after the contract period. The software Licenses should becomprehensive and no further licenses should be required for DC and DR operations. Thesoftware installed should necessarily be the latest version at the time of actual implementation.The <strong>SI</strong> shall procure all necessary updates /patches / bug fixes for this software during the projectcycle. The <strong>SI</strong> will also implement the same from time to time as required after necessaryapprovals from Sikkim Police. Tuning of application, databases, third party software‘s, and anyother components provided as part of the solution to optimize the performance will be theresponsibility of <strong>SI</strong>. The <strong>SI</strong> shall also apply regular patches to the licensed software including theoperating system and databases as released by the OEMs.The <strong>SI</strong> shall also provide services for software license management and control. <strong>SI</strong> shall maintaindata regarding entitlement for software updates, enhancements, refreshes, replacements, andmaintenance. <strong>SI</strong> should perform periodic audits to measure license compliance against theVolume <strong>III</strong> Request for Proposal for Selection of System Integrator Page 117 of 132

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!