12.07.2015 Views

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Crime</strong> & Criminals Tracking Network and Systems ProjectSikkim PoliceServiceDescriptionLevel MeasurementIn addition to the above, if the service level in any month in the six-monthperiod falls below 98%, one (1) additional violation will be added for each% drop for each such month to the overall violations for this service level.InfrastructureAvailabilityAvailability of non-CAS systems in production and non-productionsystems shall be at least 97%.Severity of Violation: MediumAvailability over the sixmonthperiod< 97% & >= 96.5% 1< 96.5% & >= 96% 2< 96% 3Violations for calculation ofpenaltyInfrastructureAvailabilityIn addition to the above, if the service level in any month in the six-monthperiod falls below 96%, one (1) additional violation will be added for each% drop for each such month to the overall violations for this service level.RTO shall be less than or equal to six (6) hours.Severity of Violation: HighInfrastructureAvailabilityEach instance of non-meeting this service level will be treated as one (1)violation.RPO (zero data loss in case of failure of Primary DC) should be zerominutesSeverity of Violation: HighInfrastructurePerformanceEach instance of non-meeting this service level will be treated as two (2)violations.Sustained period of peak CPU utilization of any server crossing 70% (withthe exception of batch processing) shall be less than or equal to 30minutes.Severity of Violation: HighEach occurrence where the peak CPU utilization of any server crosses70% (with the exception of batch processing) and stays above 70% fortime more than 30 minutes will be treated as one (1) instance.Number of instances over thesix month periodViolations for calculation ofpenaltyVolume <strong>III</strong> Request for Proposal for Selection of System Integrator Page 65 of 132

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!