12.07.2015 Views

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Crime</strong> & Criminals Tracking Network and Systems ProjectSikkim Police5.3 Annexure – C: Minimum Required Deliverables & associated timelinesS. No. Project Activity Deliverables1. Project planningStudy and Design2.3.System Study – study the legislation,business processes and organization designof Sikkim Police along with relevant reportssuch as PIMDetailed assessment of functionalrequirements and MIS requirements4. Finalization/ Vetting of FRS5.Preparation of System RequirementSpecification report and SoftwareRequirement Specification reporti. Detailed Project Plan for Implementation of the Projectii. Risk Management and Mitigation Planiii. Manpower Deployment Planiv. A comprehensive System Study documentv. Updated/ vetted FRS report including list of additionalfeatures that would result in further improvement in theoverall application performance for consideration of thedepartmentvi. A comparative report on the extent of functionalitycurrently available in the vendor‘s application (CASprovided by Centre) other applications/ COTS productsand with the FRS for CRPvii. Detailed integration and interfacing modelviii. Change/Reference document including all the changesor deviations from the base version of the CAS(State)/FRS of other modulesix. System Requirement Specification Report and SoftwareRequirement Specification reports meeting all theBusiness, Functional and technical requirement ofSikkim Police and incorporating all the functionalspecifications, standards provided by the NCRB, SikkimPolice specific requirements and different integrationpoints with CAS (Centre), external agencies and otherapplications of Sikkim Policex. List of additional features proposed in complete <strong>CCTNS</strong>Applicationxi. CAS (State) Implementation document w.r.t.Timelines (T - fromdate of signing ofcontract)TT + 8 WeeksVolume <strong>III</strong> Request for Proposal for Selection of System Integrator Page 83 of 132

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!