12.07.2015 Views

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

CCTNS RFP FOR SI VOL III.pdf - National Crime Records Bureau

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Crime</strong> & Criminals Tracking Network and Systems ProjectSikkim PoliceS. No. Project Activity DeliverablesTimelines (T - fromdate of signing ofcontract)10. Others xxi. Data Migration Strategy and Methodology T+11 Weeks11.Commissioning and operationalization of ITT + 11 Weeksinfrastructure at Data Centre and DRImplement (This shall only begin after CAS (State) 3 has been received from NCRB, MHA) – T112.Study and analyze the CAS (State) system asreceived from NCRB against therequirements of Sikkim Police and conductClosed Room Pilot (CRP) based on therequirement specifications13. Finalization of requirement specificationsxxii.xxiii.Feedback Report based on CRP I and CRP IIFinal FRS, SyRS, SRS and other requirements with allthe Solution Design documentsT1 + 4 WeeksT1 + 6 Weeks14.Configuration & Customization of CAS (State)T1 + 14 Weeksand development of additional modules15. Integration with CAS (Centre) T1+ 14 Weeks16.Data migration and digitization of historicalT1 + 14 WeeksdataMigration of CIPA and CCIS Police Stations/T1 + 15 Weeks17. non-CIPA and CCIS Police Stations/ HigherOffices to <strong>CCTNS</strong>18.Testing of configured & deployed solutionT1 + 16 Weeks(CAS) and additional functionalities19.Site preparation at Pilot Phase Client siteT1 + 18 WeekslocationsProcurement, Commissioning andT1 + 20 Weeks20. Operationalizing the IT infrastructure at Pilotphase Police locations21.User Acceptance and Testing of Pilot PhaseT1 + 20 Weeksimplementation22.User Training on Pilot Phase <strong>CCTNS</strong>T1 + 22 WeeksSolution3 As per the guidelines of <strong>CCTNS</strong> MMP, Core Application Software (State) would be provided by NCRB.Volume <strong>III</strong> Request for Proposal for Selection of System Integrator Page 85 of 132

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!