12.07.2015 Views

developing a model for integrating safety, quality and productivity in ...

developing a model for integrating safety, quality and productivity in ...

developing a model for integrating safety, quality and productivity in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Mohamed, S. <strong>and</strong> Sr<strong>in</strong>av<strong>in</strong>, K., 2002, Thermal environment effects on constructionworkers’ <strong>productivity</strong>. Work Study, Vol. 51, No. 6, pp. 297 – 302.Navon, R., 2005, Automated project per<strong>for</strong>mance control of construction projects,Automation <strong>in</strong> Construction, Vol. 14, No. 4, pp. 467 – 476.Odeh AM, <strong>and</strong> Batta<strong>in</strong>eh HT., 2002, Causes of construction delay: traditionalcontracts. International Journal of Project Management; Vol. 20, No. 1, pp. 67–73.Odusami, K.T., 2002, Perceptions of Construction Professionals Concern<strong>in</strong>gImportant Skills of Effective Project Leaders, Journal of Management <strong>in</strong>Eng<strong>in</strong>eer<strong>in</strong>g, Vol. 18, No. 2, pp. 261 – 267.Pheng, L. S. <strong>and</strong> Ke-Wei, P., 1996, A framework <strong>for</strong> implement<strong>in</strong>g TQM <strong>in</strong>construction, The TQM Magaz<strong>in</strong>e, Vol. 8, No. 5, pp. 39 – 46Proverbs DG, Holt GD, Olomolaiye PO., 1999, A method <strong>for</strong> estimat<strong>in</strong>g labourrequirements <strong>and</strong> costs <strong>for</strong> <strong>in</strong>ternational construction projects at <strong>in</strong>ception.Build<strong>in</strong>g <strong>and</strong> Environment, Vol. 34, No. 1, 43–48.Proverbs, D. G., Holt, G. D., <strong>and</strong> Olomolaiye, P. O., 1998a, a comparativeevaluation of concrete plac<strong>in</strong>g <strong>productivity</strong> rates amongst French, German <strong>and</strong>UK construction contractors, Eng<strong>in</strong>eer<strong>in</strong>g, Construction <strong>and</strong> ArchitecturalManagement Vol. 5, No. 2, pp. 174 – 181.Proverbs, D. G., Holt, G. D., <strong>and</strong> Olomolaiye, P. O., 1998b, a comparativeevaluation of re<strong>in</strong><strong>for</strong>cement fix<strong>in</strong>g <strong>productivity</strong> rates amongst French, German<strong>and</strong> UK construction contractors, Eng<strong>in</strong>eer<strong>in</strong>g, Construction <strong>and</strong> ArchitecturalManagement, Vol. 5, No. 4, pp. 350– 358.Radosavljevic, M. <strong>and</strong> Horner, R. M. W., 2002, The evidence of complexvariability <strong>in</strong> construction labour <strong>productivity</strong>. Construction Management <strong>and</strong>Economics, Vol. 20, Bo. 1, pp. 3-12Raufaste, N., <strong>and</strong> Callahan, J., 2002, Map Overview, A Draft Strategic Plan toImprove the Competitiveness of the West Bank <strong>and</strong> Gaza Strip ConstructionSector, Palest<strong>in</strong>e.Salaheld<strong>in</strong>, I. S., 2003, The implementation of TQM strategy <strong>in</strong> Egypt: a field-<strong>for</strong>ceanalysis, The TQM Magaz<strong>in</strong>e, Vol. 15, No. 4, pp. 266 - 274190

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!