12.07.2015 Views

developing a model for integrating safety, quality and productivity in ...

developing a model for integrating safety, quality and productivity in ...

developing a model for integrating safety, quality and productivity in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

xiii. Co-operation between construction <strong>in</strong>dustry <strong>and</strong> scientific organizationsxiv. Participat<strong>in</strong>g <strong>and</strong> co-operat<strong>in</strong>g with advanced <strong>in</strong>ternational organizationsxv. Def<strong>in</strong><strong>in</strong>g responsibilities between project partiesxvi. Encourag<strong>in</strong>g <strong>in</strong>novation <strong>for</strong> simpler <strong>and</strong> more accurate work methodsConstruction <strong>quality</strong> <strong>in</strong> <strong>develop<strong>in</strong>g</strong> countries faces many obstacles due to complexnature of construction <strong>in</strong>dustry. Barriers <strong>and</strong> restra<strong>in</strong>ts to implementation ofconstruction <strong>quality</strong> are many. Griffith (2000) stressed that over the last decade,International Organization <strong>for</strong> St<strong>and</strong>ardization (ISO) 9000 certification has, <strong>in</strong> thema<strong>in</strong>, been considered sufficient to illustrate a company’s commitment to deliver aproduct or service. This idea changed recently. In Saudi Arabia, what is perhaps \moreimportant still is the f<strong>in</strong>d<strong>in</strong>g that project parties do not feel ISO 9000 was <strong>in</strong> itselfsufficient to produce <strong>quality</strong> products. Nor was it found to be sufficient <strong>in</strong> establish<strong>in</strong>gan effective <strong>quality</strong> management system (Curry <strong>and</strong> Kadasah, 2002). Abdel-Razek(1998) concluded <strong>in</strong> his study that manufactur<strong>in</strong>g firms’ leaders <strong>in</strong> Egypt should knowthat there is a difference between ISO certification <strong>and</strong> TQM strategy where the<strong>for</strong>mer is a prerequisite <strong>for</strong> the last.The follow<strong>in</strong>g are a summary of barriers to achiev<strong>in</strong>g <strong>and</strong> improv<strong>in</strong>g <strong>quality</strong> <strong>in</strong> SouthAfrica (Cited by Alman <strong>in</strong> Smallwood <strong>and</strong> Ventur, 2003):i. the dom<strong>in</strong>ant use of the traditional construction procurement system (TCPS)ii.contractors compet<strong>in</strong>g primarily on costiii. short contract durationsiv.separation of design <strong>and</strong> constructionv. <strong>in</strong>tricate <strong>and</strong> impractical detailsvi.poor design coord<strong>in</strong>ationvii. unrealistic specificationsF<strong>in</strong>ally, Abdel-Razek (1998) concluded that due to the great importance to <strong>develop<strong>in</strong>g</strong>countries to use appropriate methods <strong>in</strong> <strong>quality</strong> management, it is important to ensurethat, <strong>in</strong> most cases, saimple basic methods <strong>and</strong> techniques will give a better result thancurrently fashionable methods.24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!