12.07.2015 Views

developing a model for integrating safety, quality and productivity in ...

developing a model for integrating safety, quality and productivity in ...

developing a model for integrating safety, quality and productivity in ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. The study is limited to the contract<strong>in</strong>g companies classified by PCU exclud<strong>in</strong>gother classifications announced by <strong>in</strong>ternational organizations such asUNRWA <strong>and</strong> UNDP, etc.3. The subcontractors <strong>and</strong> contract<strong>in</strong>g companies of fourth <strong>and</strong> fifth categorieswere excluded due to low rate of m<strong>in</strong>imum experience, efficiency <strong>and</strong>managerial <strong>and</strong> f<strong>in</strong>ancial capability of such companies which may affect theaccuracy of the research results.4. The research was conducted tak<strong>in</strong>g <strong>in</strong>to account only the contractor po<strong>in</strong>t ofview exclud<strong>in</strong>g the owner <strong>and</strong> consultant po<strong>in</strong>t of view.5. This research was limited to the construction <strong>in</strong>dustry practitioners <strong>in</strong> GazaStrip with<strong>in</strong> the last five years.6. The research was conducted <strong>in</strong> Gaza Strip <strong>and</strong> was not conducted <strong>in</strong> the WestBank due to barriers <strong>and</strong> travel limitations.69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!