13.07.2015 Views

e r 2 - Umgeni Water

e r 2 - Umgeni Water

e r 2 - Umgeni Water

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

| Financial Plan ChapterProject Cat.EIB Funded Projects<strong>Umgeni</strong> SystemProject Description<strong>Umgeni</strong> <strong>Water</strong> StrategicOutcomesCustomerProject StageProject Total30-Year (R’000)Work In Progress30/06/2010 (R’000)Forecast F'11 (R’000)CASH FLOWS 2012 – 2016 (R’000)2012 - 2016 F'12 F'13 F'14 F'15 F'16Cash flows Beyond5 Years F'17 - F'40REH Lower <strong>Umgeni</strong> Nagle Aqueduct 3 & 4 - Refurbish Infrastructure Stability eThekwini MM B1-A1 8 500 4 950 3 550 3 150 400REH Lower <strong>Umgeni</strong> Dbn Hts WW: Reservoir 3 Roof Rehab & Dam Safety Infrastructure Stability eThekwini MM B1 28 000 28 000 3 000 15 000 10 000REH South Coast Nungwane Raw <strong>Water</strong> Aqueduct (450dia x 18km) Infrastructure Stability eThekwini MM, Ugu DM B2 76 220 69 640 1 000 6 640 3 000 59 000 6 580REH Upper <strong>Umgeni</strong> Darvill Various Projects Infrastructure Stability eThekwini MM B1-A2 7 900 5 840 2 060 1 940 120REH Various Other Projects Beyond 5 Years 18 502 1 847 4 462 4 193 593 3 600 8 000Sub-Total Rehabilitation 139 122 1 847 15 252 107 443 5 683 8 120 21 640 13 000 59 000 14 580UPG Aircon Renewal:Head Office Operational Resiliency AI 30 306 23 306 7 000 7 000UPG Refurbishment Head Office Operational Resiliency AI 25 000 10 000 15 000 10 000 5 000UPG EIB Hazelmere Hazelmere WW pumpstation upgrade Infrastructure Stability eThekwini MM, iLembe DM B2 19 500 19 500 1 000 18 500UPG Lower <strong>Umgeni</strong> Wiggins Various Projects Infrastructure Stability eThekwini MM B1-A2 25 765 3 215 21 750 12 150 9 600 800UPG Lower <strong>Umgeni</strong> Wiggins Dam Safety: Concrete Rehab Infrastructure Stability eThekwini MM 10 000 10 000 10 000UPG Lower <strong>Umgeni</strong> Dbn Hts WW: Candy Filters and Actuators upgrade Infrastructure Stability eThekwini MM B1-A2 20 500 20 500 500 20 000UPG Lower <strong>Umgeni</strong> Ozone Plant Rehb & Element Replace (every 10 years) Infrastructure Stability eThekwini MM 60 000 20 000 1 000 10 000 9 000 40 000UPG Lower <strong>Umgeni</strong> Dbn Hts WW: Filter Upgrade Infrastructure Stability eThekwini MM C1 85 400 85 400 2 700 2 700 20 000 20 000 40 000UPG Lower <strong>Umgeni</strong> Dbn Heights Various Projects Infrastructure Stability eThekwini MM B1-A2 60 911 10 561 38 350 20 865 10 810 2 675 3 500 500 12 000UPG Upper <strong>Umgeni</strong> Darvill Aerators Infrastructure Stability Msunduzi LM 15 500 15 500 500 15 000UPG Upper <strong>Umgeni</strong> Darvil Sludge Handling Facility Infrastructure Stability Msunduzi LM 17 500 17 500 500 7 000 10 000UPG Various Other Projects Beyond 5 Years 216 232 3 821 35 706 51 855 24 805 20 450 4 400 1 750 450 124 850Sub-Total Upgrade 586 614 3 821 82 788 322 355 80 020 111 560 64 575 25 250 40 950 177 650TOTAL IMMOVABLES 11 390 203 522 190 496 835 2 694 387 526 796 556 561 561 977 469 327 579 726 7 676 791OTHER Movables - Head Office Operational Resiliency 14 378 2 488 11 890 6 890 2 000 3 000ICT Information Communication & Technology Operational Resiliency 187 646 1 012 17 378 74 256 26 206 16 000 10 800 9 550 11 700 95 000OTHER Scientific Services Operational Resiliency 66 751 2 196 13 373 51 182 25 053 15 919 3 300 1 180 5 730OTHER Plant & Vehicles Operational Resiliency 49 187 19 824 29 363 4 583 10 040 2 610 10 930 1 200TOTAL MOVABLES 317 962 3 209 53 062 166 691 62 732 43 959 16 710 24 660 18 630 95 000TOTAL UW CAPEX BUDGET AS PER 2011/12 BUSINESS PLAN 11 708 164 525 398 549 897 2 861 078 589 528 600 520 578 687 493 987 598 356 7 771 791CASH FLOWS AS PER 2010/11 BUSINESS PLAN 12 266 002 241 124 774 017 2 525 513 615 262 409 210 371 798 351 924 777 320 8 725 349INCREASE / (DECREASE) (557 838) (224 120) 335 565 (25 734) 191 310 206 889 142 063 (178 964) (953 558)UPG = Upgrade, EXP = Expansion, REH = Rehabilitation, AUG = Augmentation, DEV = Development Projects, ICT = Information & Communication Technology Other = Equipment & VehiclesA1 = In Construction, A2 = In Tender, B1 = In Detailed Design, B2 = In Preliminary Design, C1 = In Detailed Feasibility, C2 = In Pre-Feasibility, O = CommissionedEIB = EIB Funded Projects<strong>Umgeni</strong> <strong>Water</strong> Five-Year Business Plan| 2011/2012 to 2015/2016 Page 113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!