13.07.2015 Views

e r 2 - Umgeni Water

e r 2 - Umgeni Water

e r 2 - Umgeni Water

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter| Bulk Potable <strong>Water</strong> Supply Planability to allow for bi-directional flow to ensure that in the future water can be brought south from a <strong>Water</strong>Treatment Works situated at the uThukela River or the Mvoti River.• Construct an abstraction works on the uThukela River with a regional <strong>Water</strong> Treatment Works andassociated infrastructure to supply water south to KwaDukuza Local Municipality and north to MandiniLocal Municipality. This system would link into the NCSS. The <strong>Water</strong> Treatment Works would beconstructed to initially serve 55 000 cubic metres per day and when demands dictate it would be upgradedto 110 000 cubic metres per day.• Develop water resource infrastructure on the Mvoti River, either at Welverdient or Isithundu with a regional<strong>Water</strong> Treatment Works and associated supply infrastructure to further augment the NCSS. At some stagein the future, the long-term water demands to the north of the uThukela River may require the full (ormajority of) allocation from the Lower Thukela <strong>Water</strong> Treatment Works. In this scenario potable water mayneed to be supplied northwards from the NCSS (i.e. towards the Lower Thukela <strong>Water</strong> Treatment Works) tomeet the demands on the southern side of the uThukela River.Page 52 <strong>Umgeni</strong> <strong>Water</strong> Five-Year Business Plan | 2011/2012 to 2015/2016

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!