13.07.2015 Views

e r 2 - Umgeni Water

e r 2 - Umgeni Water

e r 2 - Umgeni Water

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

| Organisational Scorecard: Key Performance Indicators Linked to Strategy and Five-Year Projected TargetsChapterEndNotesi Listof treatment works for section 29 and section 30 water servicesSection 29 list of water treatment works Section30 list of water treatment works Section 29 list of wastewatertreatment worksDurban HeightsWigginsMidmarDV HarrisHazelmereAmanzimtotiMzintoMtwalumeIxopooMvoti and other iLembePeriod: 2011/2012 to 2013/2014MthathaCoranaMhlahlaneMqanduliCoffee BayQhingqoloLibodeNgquleniLutshekoDarvillIxopoSection 30 list of wastewatertreatment worksPeriod: 2011/2012 to 2013/2014HowickPeriod: 2011/2012 to 2013/2014Mthathaii Listof capital infrastructure projects in five-year business planLivelihoodsEconomic GrowthMaphumuloWW: MidmarupgradeMhlabatshaneWW: Hazelmere upgradeGreater Eston Umlaas new water projectOzwathiniLower Mkomazi bulk water supply scheme and WWManyavuLower Thukela bulk water supply scheme and WWMkomazi water supply project and WWWGreater Mpofana regional schemeWW: Spring GroveWW: Maphephethwa upgradeRichmondReservoir: Howick upgradeReservoir: Bruyns Hill upgradePipeline: ’61 extension - ED4 to Umlaas RdPipeline: ’61 extension - ED2 to ED4Pipeline: ’57 augmentation – Umlaas Rd to eThekwini point MPipeline and Pump Station: Midmar Raw <strong>Water</strong> duplicationPipeline: new raw water pipeline – Midmar dam to raw water P/SPump Station: Midmar dam raw waterPipeline: Honolulu to Mvoti balancing reservoir pipelinePipeline: Hazelmere to Bifurcation augmentationPipeline: Hazelmeree raw waterPump Station: South Coast AugmentationPipeline: South Coast Phase 2 – Park Rynie to KelsoPipeline: ScottburghSouth LinkPipeline: Mzinto link- Ellingham Reservoir to Mzinto WWPipeline: Claridge toWartburg to DaltonPipeline and Pump Station: Claridge to Wartburg augmentationPipeline and Pump Station: Wartburg to Dalton augmentationWWW: Darvill capacityincrease.iii Wa ater resources infrastructure developments (both <strong>Umgeni</strong> <strong>Water</strong> and DWA) in five-year business planList of projectsUgu DMiLembe DM2010/2011 Mhlabatshane DamSikoto DamMvutshane Dam2011/ /2012Mhlabatshane DamSikoto DamMvutshaneDam2012/2013 Mhlabatshane DamSikoto DamMvutshane Dam2013/2014 Sikoto DamMvutshane Dam2014/2015 Sikoto DamMvutshane Dam2015/2016Sikoto DameThekwini MM Spring Grove DamMkomazi DamSpring Grove DamMkomazi DamSpring Grove DamMkomazi DamMkomazi DamMkomazi DammMkomazi Damiv Th e social economy refers to a third sector in economiesbetween the private sector and business or, the public sector and government, e.g. cooperatives.v Thegreen economy creates jobs, ensures real sustainable economic growth, whilstmitigating climate change, resources depletion and environmental edegradation.Main sectors identified:(1) Renewable energy (solar, wind, geothermal, wave, biogas, fuel cell,etc).(2) Green buildings (green retrofits for energy and water efficiency, green products / materials, etc)(3) Clean transportation (alternative fuels, hybridand electric vehicles, public transport, etc)(4) <strong>Water</strong> management (water purification, water reclamation, greywater reuse, rainwater systems, stormwater management, low-water landscaping)(5) Waste management (recycling including e(electronic) waste, brownfieldland remediation, sustainable packaging).(6) Land management(habitat conservation and rehabilitation, etc.<strong>Umgeni</strong> <strong>Water</strong> Five-Year Business Plan | 2011/2012 to 2015/2016 Page 162

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!