Annex d – details of results<br />
<strong>in</strong>frastructure rema<strong>in</strong>s unused. A solution would be<br />
to dimension this leg smaller.<br />
• Due to this large impact of w<strong>in</strong>d teed-<strong>in</strong> to the <strong>in</strong>terconnection,<br />
the m<strong>in</strong>imum distance grows with the<br />
imbalance of the price levels.<br />
• Correlation between w<strong>in</strong>d and price imbalance is<br />
beneficial for a tee-<strong>in</strong> solution.<br />
• If the price difference profile is correlated with the<br />
w<strong>in</strong>d power production, this will have an impact on<br />
the m<strong>in</strong>imum tee-<strong>in</strong> distance. If the price difference<br />
is lower when there is a lot of w<strong>in</strong>d, the impact of<br />
constra<strong>in</strong><strong>in</strong>g the cable will be less important and<br />
the m<strong>in</strong>imum distance to shore will become shorter.<br />
If the price difference is higher at times of high<br />
w<strong>in</strong>d energy production the effect is opposite.<br />
FiGuRe 13.9: m<strong>in</strong>imum distance FROm the w<strong>in</strong>d FaRm tO shORe FOR diFFeRent aveRaGe absOlute pRice diFFeRences [km].<br />
(<strong>in</strong>teRcOnnectOR capacity OF 1000 mw, aveRaGe absOlute pRice diFFeRence OF €7.5, unbalanced FlOw with 30% OF<br />
pRice diFFeRence FlOw<strong>in</strong>G tOwaRds One cOuntRy impact OF distance wF tO <strong>in</strong>teRcOnnectOR)<br />
M<strong>in</strong>imum distance WF<br />
from shore (km)<br />
900<br />
800<br />
700<br />
600<br />
500<br />
400<br />
300<br />
200<br />
100<br />
0<br />
100 300 500 700 900 1,100 1,300 1,500 1,700 1,900<br />
W<strong>in</strong>d farm capacity (MW)<br />
20 EUR 15 EUR 10 EUR 7.5 EUR 5 EUR 2.5 EUR<br />
FiGuRe 13.10: impact OF <strong>in</strong>cReas<strong>in</strong>G <strong>in</strong>teRcOnnectOR capacity On the maximum beneFicial distance FOR hub-hub<br />
<strong>in</strong>teRcOnnectORs. (diRect <strong>in</strong>teRcOnnectOR distance tO which cOmpaRed: 500 mw, aveRaGe absOlute pRice diFFeRence<br />
between the cOuntRies: €5/mwh)<br />
M<strong>in</strong>imum distance<br />
between hubs (km)<br />
600<br />
500<br />
400<br />
300<br />
200<br />
100<br />
0<br />
100<br />
200<br />
300<br />
400<br />
500<br />
600<br />
700<br />
800<br />
500 MW hub-to-hub <strong>in</strong>terconnector<br />
900<br />
W<strong>in</strong>d farm capacity (MW)<br />
134 <strong>Offshore</strong>Grid – F<strong>in</strong>al Report<br />
1,000<br />
1,100<br />
1,200<br />
1,300<br />
1,400<br />
1,500<br />
1,600<br />
1,700<br />
1,800<br />
1,000 MW hub-to-hub <strong>in</strong>terconnector<br />
1,900<br />
2,000