Offshore Electricity Infrastructure in Europe - European Wind Energy ...
Offshore Electricity Infrastructure in Europe - European Wind Energy ...
Offshore Electricity Infrastructure in Europe - European Wind Energy ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
esults<br />
FIGURE 4.31: cOMPARISON OF cAPEX SPENd PER INTERcONNEcTION, FOR ThE dIREcT ANd SPlIT OFFShORE GRId dESIGN<br />
METhOdOlOGIES (€ bN)<br />
Costs per<br />
<strong>in</strong>terconnection (€bn)<br />
1.2<br />
1.0<br />
0.8<br />
0.6<br />
0.4<br />
0.2<br />
FIGURE 4.32: cOMPARISON OF ANNUAl REdUcTION IN SYSTEM cOSTS PER INTERcONNEcTION, FOR ThE dIREcT ANd SPlIT<br />
OFFShORE GRId dESIGN METhOdOlOGIES (€ bN)<br />
Reduction <strong>in</strong> system<br />
generation costs per<br />
<strong>in</strong>terconnection (€bn)<br />
0.2<br />
0.2<br />
0.1<br />
0.1<br />
0<br />
0<br />
Base case<br />
Direct Design<br />
Split Design<br />
Base case<br />
Direct Design<br />
Split Design<br />
SE-DE<br />
SE-DE<br />
FI-EE<br />
FI-EE<br />
SE-PL<br />
SE-PL<br />
SE-DK<br />
SE-DK<br />
SE-LV<br />
Direct <strong>in</strong>terconnections<br />
Omitted as not bene�cial<br />
SE-LV<br />
Direct <strong>in</strong>terconnections<br />
Omitted as not bene�cial<br />
GB-FR<br />
GB-FR<br />
SE-DE<br />
SE-DE<br />
GB-BE<br />
Split Design Direct Design<br />
GB-BE<br />
GB-FR<br />
Split Design Direct Design<br />
70 <strong>Offshore</strong>Grid – F<strong>in</strong>al Report<br />
GB-FR<br />
SE-PL<br />
SE-PL<br />
SE-DK<br />
SE-DK<br />
IE-FR<br />
Split <strong>in</strong>terconnections Hub-to-hub and Tee-<strong>in</strong> Mesh<br />
IE-FR<br />
Split <strong>in</strong>terconnections Hub-to-hub and Tee-<strong>in</strong> Mesh<br />
IE-GB<br />
IE-GB<br />
GB-BE<br />
GB-BE<br />
NO-NL<br />
NO-NL<br />
SE-DK<br />
SE-DK<br />
NL-GB<br />
NL-GB<br />
GB-DE<br />
GB-DE<br />
Mesh<br />
Mesh