TAblE 4.2: SUMMARY OF ThE RESUlTS OF ThE TEE-IN cASES<br />
18 <strong>Offshore</strong>Grid -- Stakeholder Advisory Board meet<strong>in</strong>g, 21/01/2010, Brussels.<br />
<strong>Offshore</strong>Grid -- 2nd Northern <strong>Europe</strong>an Stakeholder Workshop, 10/06/2010, Brussels.<br />
<strong>Offshore</strong>Grid – F<strong>in</strong>al Report<br />
<strong>in</strong>frastructure<br />
costs changes<br />
Additional system costs<br />
(over the lifetime)<br />
Net Benefit<br />
(over the lifetime)<br />
Dogger bank A <strong>in</strong>to BritNor - €290 m + €400 m - €110 m<br />
Dan Tysk group <strong>in</strong>to NordL<strong>in</strong>k - €160 m + €63 m + €100 m<br />
Butendiek <strong>in</strong>to Cobra - €207 m - €43 m + €250 m<br />
NordSee Ost group <strong>in</strong>to Cobra - €280 m - €61 m + €341 m<br />
The pr<strong>in</strong>cipal conclusions from a sensitivity analysis<br />
of the effect of chang<strong>in</strong>g parameters on the net benefit<br />
are:<br />
• Asymmetrical cable dimensions can <strong>in</strong>crease the<br />
system benefits.<br />
Increas<strong>in</strong>g the capacity of one part of the <strong>in</strong>terconnector<br />
(from the tee-jo<strong>in</strong>t position), can lead to<br />
better results. Capacity should then be <strong>in</strong>creased<br />
at the side of the country with the highest prices<br />
(as trade flows towards the lower price level). A<br />
higher capacity would allow trade and parallel w<strong>in</strong>d<br />
energy transport. The BritNor and NordL<strong>in</strong>k cases<br />
demonstrate that asymmetrical cable dimension<strong>in</strong>g<br />
can <strong>in</strong>crease trade possibilities to such an extent<br />
that the costs for larger <strong>in</strong>frastructure are more<br />
than compensated.<br />
• Tee-<strong>in</strong> benefits are largely dependent on w<strong>in</strong>d farm<br />
sizes.<br />
To add a different solution the follow<strong>in</strong>g case for<br />
the 1,000 MW Dogger Bank w<strong>in</strong>d farm was <strong>in</strong>vestigated:<br />
500 MW were teed <strong>in</strong>to the <strong>in</strong>terconnector<br />
and 500 MW were connected directly to shore.<br />
It was shown that net benefits for this case are<br />
smaller <strong>in</strong> spite lower trade constra<strong>in</strong>ts on the <strong>in</strong>terconnector.<br />
The reason is that <strong>in</strong> this case 500<br />
MW rema<strong>in</strong> to be connected <strong>in</strong>dividually to shore,<br />
which is relatively more expensive than connect<strong>in</strong>g<br />
a 1,000 MW w<strong>in</strong>d farm (lower economies of scale).<br />
• Additional parallel trade <strong>in</strong>terconnections can<br />
render a tee-jo<strong>in</strong>t more attractive than a direct <strong>in</strong>terconnector,<br />
as price differences will be lower and<br />
trade less important.<br />
• The effect of an additional UK-NO <strong>in</strong>terconnector<br />
on the cost-benefit of the tee-<strong>in</strong> solution for Dogger<br />
Bank A is <strong>in</strong>vestigated. This makes the comb<strong>in</strong>ed<br />
UK-NO market more efficient and thus reduces<br />
the value of trade between both countries. The<br />
reduction <strong>in</strong> system benefits (economic trade constra<strong>in</strong>ts)<br />
is therefore lower, go<strong>in</strong>g from €400 m to<br />
€307 m. As this is still higher than the achieved<br />
reduction <strong>in</strong> <strong>in</strong>frastructure costs, the tee-<strong>in</strong> solution<br />
for Dogger Bank A is still not beneficial.<br />
This analysis demonstrates that the techno-economic<br />
relations are complex and that real cases do not allow<br />
generalised conclusions. Further <strong>in</strong>-depth analysis<br />
lead<strong>in</strong>g to such generalised conclusions is described<br />
<strong>in</strong> section 4.4.<br />
Practical discussion<br />
In terms of power system security, an <strong>in</strong>terconnector<br />
cable with a w<strong>in</strong>d farm connected <strong>in</strong> a tee-<strong>in</strong><br />
configuration must be considered as one s<strong>in</strong>gle asset.<br />
In case of a s<strong>in</strong>gle fault anywhere on this asset, the<br />
<strong>in</strong>terconnector plus w<strong>in</strong>d farm would need to be isolated<br />
from the power system on both sides. Consequently,<br />
the power systems on both sides will experience a<br />
sudden change <strong>in</strong> power <strong>in</strong>feed, and cont<strong>in</strong>gency for<br />
this scenario must be considered accord<strong>in</strong>g to the<br />
appropriate regulation. This may lead to an <strong>in</strong>creased<br />
requirement for frequency reserves on either side of the<br />
tee-<strong>in</strong>, which should be considered before this option is<br />
recommended. It should be noted that discussion with<br />
representatives from some of the TSOs concerned<br />
dur<strong>in</strong>g formal and <strong>in</strong>formal stakeholder <strong>in</strong>teraction 18<br />
have <strong>in</strong>dicated that TSOs would prefer a solution with<br />
fast circuit breakers on a platform to a simple tee-jo<strong>in</strong>t,<br />
for reasons of operational security and fault handl<strong>in</strong>g.<br />
TSOs today have many years of experience with <strong>in</strong>terconnectors<br />
based on Current Source Convertor (CSC)<br />
technology. The largest CSC Interconnector <strong>in</strong> <strong>Europe</strong><br />
is rated at 2,000 MW and has been <strong>in</strong> operation s<strong>in</strong>ce<br />
45