05.12.2012 Views

Annual Report 2008-2009 - Department of Transport

Annual Report 2008-2009 - Department of Transport

Annual Report 2008-2009 - Department of Transport

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

23 Property, plant, equipment, vehicles and vessels<br />

<strong>2009</strong> <strong>2008</strong><br />

Accum. Accum.<br />

Cost/Fair Accum. impairment Carrying Cost/Fair Accum. impairment Carrying<br />

value depr. losses amount value depr. losses amount<br />

$ 000 $ 000 $ 000 $ 000 $ 000 $ 000 $ 000 $ 000<br />

At fair value:<br />

Land 111 583 - - 111 583 92 924 - - 92 924<br />

Pastoral land leases 79 825 - - 79 825 75 904 - - 75 904<br />

Crown land leases 3 502 - - 3 502 9 015 - - 9 015<br />

Buildings 31 183 13 044 - 18 139 28 874 11 654 - 17 220<br />

At cost:<br />

226 093 13 044 - 213 049 206 717 11 654 - 195 063<br />

Refurbishments 16 107 9 432 - 6 675 11 621 8 102 - 3 519<br />

Plant and equipment 6 126 4 505 1 1 620 5 799 4 169 22 1 608<br />

Computer hardware 7 559 4 234 - 3 325 7 304 3 975 - 3 329<br />

Furniture and fittings 278 124 - 154 273 103 - 170<br />

Vehicles 189 171 - 18 189 159 - 30<br />

Vessels 1 476 630 - 846 1 160 513 - 647<br />

31 735 19 096 1 12 638 26 346 17 021 22 9 303<br />

Total 257 828 32 140 1 225 687 233 063 28 675 22 204 366<br />

Freehold land and buildings were revalued as at 1 July <strong>2008</strong> by the Western Australian Land Information Authority (Valuation Services).<br />

The valuations were performed during the year ended 30 June <strong>2009</strong> and recognised at 30 June <strong>2009</strong>. In undertaking the revaluation,<br />

fair value was determined by reference to market values for land: $85,951,000 and buildings: $6,556,000. For the remaining balance<br />

fair values <strong>of</strong> land was determined on the basis <strong>of</strong> current use for land: $108,959,000 and depreciated replacement cost for buildings:<br />

$11,583,000. See note 3(h) Property, plant and equipment and infrastructure.<br />

“Accum.” denotes accumulated and “depr.” denotes depreciation.<br />

107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!