VGB POWERTECH 11 (2019)
VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 11 (2019). Technical Journal of the VGB PowerTech Association. Energy is us! Power plant operation: legal & technology. Pumped hydro storage. Latent heat storages.
VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 11 (2019).
Technical Journal of the VGB PowerTech Association. Energy is us!
Power plant operation: legal & technology. Pumped hydro storage. Latent heat storages.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
A journey through 100 years <strong>VGB</strong> | <strong>VGB</strong> <strong>POWERTECH</strong> 4 (2006)<br />
50 Jahre KRAFTWERKSSCHULE/50 Years of KWS Training Center<br />
Bild 3. <strong>VGB</strong>-Haus.<br />
Figure 3. <strong>VGB</strong> House.<br />
Sie haben heute mehr Verantwortung, arbeiten flexibler und beherrschen<br />
ein breites Tätigkeitsspektrum. Das alles erhöht ihren Wert auf<br />
dem Arbeitsmarkt“, so Markus Bieder, RWE Power AG, Kraftwerke<br />
Region West, GuD-Anlage Ludwigshafen, Leiter des Ausbildungsausschusses<br />
der KRAFTWERKSSCHULE E.V.<br />
Ungeachtet dieser Erleichterung der Raumprobleme waren sich<br />
die Verantwortlichen der KWS darüber im Klaren, dass es sich nur<br />
um eine Zwischenlösung handeln konnte. Das stetige Pendeln der<br />
Dozenten zwischen der Klinkestraße und der Außenstelle war<br />
einem geregelten Unterrichtsablauf abträglich und auf die Dauer<br />
nicht zumutbar. Daher begannen Vorstand und Geschäftsführung der<br />
KRAFTWERKSSCHULE E.V. schon kurz nach dem Bezug der<br />
Außenstelle Ruhrallee, über eine langfristige Unterbringung aller<br />
Aktivitäten der Schule an einem neuen gemeinsamen Standort nachzudenken.<br />
Eine Reihe von möglichen Standorten in Essen und der näheren<br />
Umgebung wurde im Rahmen der geplanten Verlegung der KRAFT-<br />
WERKSSCHULE E.V. begutachtet, aber es war wiederum das<br />
Deilbachtal in Kupferdreh, für das man sich letztlich entschied<br />
(Bild 5). Schließlich gab es hier bereits das gut erschlossene KSG-<br />
Gelände, das groß genug war, um auch die KWS unterzubringen.<br />
Mit Zustimmung der Mitgliederversammlung kaufte die Schule zu<br />
diesem Zweck im Jahre 1993 ein Grundstück mit einer Gesamtfläche<br />
von insgesamt 12 300 m 2 von der KSG zurück. Die Bauarbeiten an<br />
dem neuen Schulungszentrum begannen im November 1994, und<br />
am 16. März 1995 wurde mit einem Festakt der Grundstein gelegt.<br />
Auf dem Gelände entstand ein Gebäudekomplex mit insgesamt vier<br />
Geschossen. Darin fanden 30 Hörsäle Platz, außerdem Seminar- und<br />
Bild 4. KWS Außenstelle an der Ruhrallee.<br />
Figure 4. KWS branch at the Ruhrallee.<br />
more flexibly, and have a wider range of skills than ever before. All<br />
of this increases their desirability in the labour market.”<br />
Markus Bieder, RWE Power AG, Power Plants Western Region<br />
West, CCGT plant Ludwigshafen; Head of KWS PowerTech Training<br />
Center Training Committee<br />
In spite of the relief the Ruhrallee facilities offered, all parties concerned<br />
were aware of the fact that this was only a temporary solution.<br />
In the long run, having instructors commute between<br />
Klinkestrasse and Ruhrallee day after day hampered training procedures<br />
and was therefore unacceptable. A short time after the<br />
Ruhrallee branch office was opened, KWS executives began to consider<br />
combining all of the school´s activities in one spot.<br />
While a number of possible sites in and around Essen had been taken<br />
into consideration as KWS´s new home, the Deilbachtal in Kupferdreh<br />
was once again chosen. After all, the well-developed property<br />
of the KSG was located there, a piece of land big enough to house<br />
KWS as well. With the assent of its General Assembly, the school<br />
bought back 12,300 square meters of real estate from KSG in 1993.<br />
Construction of the new training center began in November, 1994,<br />
the ceremonial laying of the cornerstone took place on March 16th,<br />
1995. A four-storey building complex was erected with 30 classrooms<br />
plus seminar rooms and laboratories for up to 350 students.<br />
The western flank of the complex housed administrative offices for<br />
30 employees, while a two-storey parking deck on the east side offered<br />
enough space for up to 200 automobiles. The layout is the same<br />
today.<br />
As for the inside story, students may take a break either in specially<br />
designated zones on each floor or in larger rest zone on the ground<br />
Bild 5. KWS-Schulungszentrum Deilbachtal.<br />
Figure 5. KWS Training Center Deilbachtal.<br />
Bild 6. Laborausrüstung „Pumpenleitstand“.<br />
Figure 6. Laboratory equipment “pump control”.<br />
<strong>VGB</strong> PowerTech <strong>11</strong>/2007 35<br />
87