20.04.2020 Views

VGB POWERTECH 11 (2019)

VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 11 (2019). Technical Journal of the VGB PowerTech Association. Energy is us! Power plant operation: legal & technology. Pumped hydro storage. Latent heat storages.

VGB PowerTech - International Journal for Generation and Storage of Electricity and Heat. Issue 11 (2019).
Technical Journal of the VGB PowerTech Association. Energy is us!
Power plant operation: legal & technology. Pumped hydro storage. Latent heat storages.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A journey through 100 years <strong>VGB</strong> | <strong>VGB</strong> <strong>POWERTECH</strong> 4 (2006)<br />

50 Jahre KRAFTWERKSSCHULE/50 Years of KWS Training Center<br />

Bild 3. <strong>VGB</strong>-Haus.<br />

Figure 3. <strong>VGB</strong> House.<br />

Sie haben heute mehr Verantwortung, arbeiten flexibler und beherrschen<br />

ein breites Tätigkeitsspektrum. Das alles erhöht ihren Wert auf<br />

dem Arbeitsmarkt“, so Markus Bieder, RWE Power AG, Kraftwerke<br />

Region West, GuD-Anlage Ludwigshafen, Leiter des Ausbildungsausschusses<br />

der KRAFTWERKSSCHULE E.V.<br />

Ungeachtet dieser Erleichterung der Raumprobleme waren sich<br />

die Verantwortlichen der KWS darüber im Klaren, dass es sich nur<br />

um eine Zwischenlösung handeln konnte. Das stetige Pendeln der<br />

Dozenten zwischen der Klinkestraße und der Außenstelle war<br />

einem geregelten Unterrichtsablauf abträglich und auf die Dauer<br />

nicht zumutbar. Daher begannen Vorstand und Geschäftsführung der<br />

KRAFTWERKSSCHULE E.V. schon kurz nach dem Bezug der<br />

Außenstelle Ruhrallee, über eine langfristige Unterbringung aller<br />

Aktivitäten der Schule an einem neuen gemeinsamen Standort nachzudenken.<br />

Eine Reihe von möglichen Standorten in Essen und der näheren<br />

Umgebung wurde im Rahmen der geplanten Verlegung der KRAFT-<br />

WERKSSCHULE E.V. begutachtet, aber es war wiederum das<br />

Deilbachtal in Kupferdreh, für das man sich letztlich entschied<br />

(Bild 5). Schließlich gab es hier bereits das gut erschlossene KSG-<br />

Gelände, das groß genug war, um auch die KWS unterzubringen.<br />

Mit Zustimmung der Mitgliederversammlung kaufte die Schule zu<br />

diesem Zweck im Jahre 1993 ein Grundstück mit einer Gesamtfläche<br />

von insgesamt 12 300 m 2 von der KSG zurück. Die Bauarbeiten an<br />

dem neuen Schulungszentrum begannen im November 1994, und<br />

am 16. März 1995 wurde mit einem Festakt der Grundstein gelegt.<br />

Auf dem Gelände entstand ein Gebäudekomplex mit insgesamt vier<br />

Geschossen. Darin fanden 30 Hörsäle Platz, außerdem Seminar- und<br />

Bild 4. KWS Außenstelle an der Ruhrallee.<br />

Figure 4. KWS branch at the Ruhrallee.<br />

more flexibly, and have a wider range of skills than ever before. All<br />

of this increases their desirability in the labour market.”<br />

Markus Bieder, RWE Power AG, Power Plants Western Region<br />

West, CCGT plant Ludwigshafen; Head of KWS PowerTech Training<br />

Center Training Committee<br />

In spite of the relief the Ruhrallee facilities offered, all parties concerned<br />

were aware of the fact that this was only a temporary solution.<br />

In the long run, having instructors commute between<br />

Klinkestrasse and Ruhrallee day after day hampered training procedures<br />

and was therefore unacceptable. A short time after the<br />

Ruhrallee branch office was opened, KWS executives began to consider<br />

combining all of the school´s activities in one spot.<br />

While a number of possible sites in and around Essen had been taken<br />

into consideration as KWS´s new home, the Deilbachtal in Kupferdreh<br />

was once again chosen. After all, the well-developed property<br />

of the KSG was located there, a piece of land big enough to house<br />

KWS as well. With the assent of its General Assembly, the school<br />

bought back 12,300 square meters of real estate from KSG in 1993.<br />

Construction of the new training center began in November, 1994,<br />

the ceremonial laying of the cornerstone took place on March 16th,<br />

1995. A four-storey building complex was erected with 30 classrooms<br />

plus seminar rooms and laboratories for up to 350 students.<br />

The western flank of the complex housed administrative offices for<br />

30 employees, while a two-storey parking deck on the east side offered<br />

enough space for up to 200 automobiles. The layout is the same<br />

today.<br />

As for the inside story, students may take a break either in specially<br />

designated zones on each floor or in larger rest zone on the ground<br />

Bild 5. KWS-Schulungszentrum Deilbachtal.<br />

Figure 5. KWS Training Center Deilbachtal.<br />

Bild 6. Laborausrüstung „Pumpenleitstand“.<br />

Figure 6. Laboratory equipment “pump control”.<br />

<strong>VGB</strong> PowerTech <strong>11</strong>/2007 35<br />

87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!