60<br />

Typowe etapy przygotowania i realizacji <strong>in</strong>westycji:<br />

Typical Investment Development and Implementation Stages:<br />

Lokalizacja <strong>in</strong>westycji<br />

Investment location<br />

Analiza opłacalności<br />

Feasibility analysis<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

<strong>Energetyka</strong> <strong>wiatrowa</strong> w <strong>Polsce</strong> / <strong>W<strong>in</strong>d</strong> <strong>energy</strong> <strong>in</strong> <strong>Poland</strong><br />

Wybór lokalizacji farmy wiatrowej, w tym:<br />

• wstępna analiza możliwości pozyskania<br />

gruntów pod farmę i <strong>in</strong>frastrukturę<br />

(zawarcie umów przedwstępnych uprawniających<br />

do dysponowania gruntami),<br />

• wstępna analiza uwarunkowań<br />

środowiskowych,<br />

• wstępne konsultacje z władzami<br />

lokalnymi.<br />

Analiza możliwości budowy farmy wiatrowej<br />

w wybranej lokalizacji, w tym<br />

• analiza aktualnych uwarunkowań zagospodarowania<br />

przestrzennego,<br />

• wstępna analiza możliwości przyłączenia<br />

do sieci elektroenergetycznej<br />

oraz analiza przebiegu tras kablowych,<br />

• wstępna analiza warunków budowlanych<br />

farmy oraz <strong>in</strong>frastruktury drogowej,<br />

• wstępny audyt ekologiczny.<br />

Uzyskanie akceptacji dla budowy farmy<br />

u władz lokalnych.<br />

Przeprowadzenie konsultacji społecznych<br />

i uzyskanie akceptacji lokalnej ludności.<br />

Wykonanie lub aktualizacja planu<br />

zagospodarowania przestrzennego albo<br />

uzyskanie decyzji o warunkach zabudowy.<br />

Przeprowadzenie badań pomiarowych<br />

parametrów wietrznych, w tym:<br />

• uzyskanie decyzji o warunkach<br />

zabudowy dla masztu pomiarowego<br />

(jednego lub więcej),<br />

• budowa masztu (-ów) i zbieranie danych<br />

w okresie m<strong>in</strong>imum 1 roku.<br />

Analiza pomiarów wietrzności,<br />

wielowariantowy dobór turb<strong>in</strong>, oszacowanie<br />

produktywności, określenie lokalizacji<br />

poszczególnych turbozespołów.<br />

Analiza wykonalności i analiza kosztów<br />

przyłączenia do sieci.<br />

Select<strong>in</strong>g w<strong>in</strong>d farm location, <strong>in</strong>clud<strong>in</strong>g:<br />

• prelim<strong>in</strong>ary analysis of potential<br />

acquisition of land for w<strong>in</strong>d farm and<br />

<strong>in</strong>frastructure (enter<strong>in</strong>g <strong>in</strong>to prelim<strong>in</strong>ary<br />

property management agreements),<br />

• prelim<strong>in</strong>ary analysis of environmental<br />

considerations,<br />

• prelim<strong>in</strong>ary consultations with local<br />

authorities.<br />

Analyz<strong>in</strong>g the feasibility of w<strong>in</strong>d farm<br />

development at a selected location,<br />

<strong>in</strong>clud<strong>in</strong>g:<br />

• analysis of potential land development<br />

constra<strong>in</strong>ts,<br />

• prelim<strong>in</strong>ary analysis of potential<br />

connection to power grid, and analysis<br />

of cable routes,<br />

• prelim<strong>in</strong>ary analysis of farm construction<br />

conditions and road <strong>in</strong>frastructure.<br />

• prelim<strong>in</strong>ary ecological audit.<br />

Obta<strong>in</strong><strong>in</strong>g farm development approval<br />

from local authorities.<br />

Conduct<strong>in</strong>g public consultations and<br />

ensur<strong>in</strong>g approval of local community<br />

Draft<strong>in</strong>g or updat<strong>in</strong>g land development<br />

plan or obta<strong>in</strong><strong>in</strong>g zon<strong>in</strong>g decision or<br />

public <strong>in</strong>vestment location decision,<br />

Conduct<strong>in</strong>g w<strong>in</strong>d potential parameter<br />

tests, <strong>in</strong>clud<strong>in</strong>g:<br />

• obta<strong>in</strong><strong>in</strong>g zon<strong>in</strong>g decision for the<br />

measurement mast,<br />

• erect<strong>in</strong>g the mast and collect<strong>in</strong>g data<br />

for at least 1 year.<br />

Analyz<strong>in</strong>g w<strong>in</strong>d power density<br />

measurements, develop<strong>in</strong>g multiple<br />

variants of turb<strong>in</strong>e selection, productivity<br />

estimation, determ<strong>in</strong><strong>in</strong>g location for<br />

<strong>in</strong>dividual turb<strong>in</strong>e sets.<br />

Feasibility study and analysis of grid<br />

connection costs<br />